TBE-Montgomery LLC / STG
Generator · Plan
| Metric or condition | Source value | Basis, scope and stage |
|---|---|---|
| Nameplate Capacity (MW) | 9 MW | Original source column definition · Generator · (U) Under construction, less than or equal to 50 percent complete As-of date 2026-08 Sources EV-39f2acb3a1d89cac1e26dbd2 |
| Net Summer Capacity (MW) | 7.4 MW | Original source column definition · Generator · (U) Under construction, less than or equal to 50 percent complete As-of date 2026-08 Sources EV-39f2acb3a1d89cac1e26dbd2 |
| Net Winter Capacity (MW) | 8.1 MW | Original source column definition · Generator · (U) Under construction, less than or equal to 50 percent complete As-of date 2026-08 Sources EV-39f2acb3a1d89cac1e26dbd2 |
Detailed source fields
| Original source field | Published value or condition |
|---|---|
| Entity ID | 56789 |
| Entity Name | TBE Montgomery LLC |
| Plant ID | 57472 |
| Plant Name | TBE-Montgomery LLC |
| Google Map | Map |
| Bing Map | Map |
| Plant State | NY |
| County | Orange |
| Balancing Authority Code | NYIS |
| Sector | IPP Non-CHP |
| Generator ID | STG |
| Unit Code | NA |
| Nameplate Capacity (MW) | 9 |
| Net Summer Capacity (MW) | 7.4 |
| Net Winter Capacity (MW) | 8.1 |
| Technology | Other Waste Biomass |
| Energy Source Code | OBG |
| Prime Mover Code | CA |
| Planned Operation Month | 12 |
| Planned Operation Year | 2039 |
| Status | (U) Under construction, less than or equal to 50 percent complete |
| Latitude | 41.4885 |
| Longitude | -74.2262 |
| Original text | (U) Under construction, less than or equal to 50 percent complete |
| Coordinate accuracy | source_precision_not_independently_surveyed |
| source_record_id | Planned:2314 |
Parent facility or plant record
Coordinates locate the plant, including when this record describes one generator.
Location: Plant location · not an individual generator location
Sources, reference dates and retrieval dates 2items
Data Source 2025 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
Source location 3_1_Generator_Y2025.xlsx#Proposed:201
Sources EV-d78c39b7ece05199cdb3cf01Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 e89604a3f1d85d8dd5e2d1ed5a72ffe31f125c0d03d23ada66ba191c68265409
Usage terms US government public domain
Data Source 2026-08 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
Source location Planned:2314
Sources EV-39f2acb3a1d89cac1e26dbd2Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 3ef610d30e155eccd5ec457b960d08a2f78b326676e3d56e1786f46b275c1c85
Usage terms US government public domain