United States of America · Generator · plant location

Cedar Hills / 17

공식 원천의 전력 객체 · Operations

Project stage · source basis
Operation announced · operating
Reported operator
King County Solid Waste Division
Address
Check each original source
Data Reference Date
2026-08
Collection review date
2026-10-05
Location meaning
Plant location · not an individual generator location · Accuracy not disclosed
Coordinates and geometry
47.455833, -122.0428

These are source records. Operator labels do not confirm legal ownership or operations. Map locations do not verify supplying substations, power contracts or current available capacity.

Power assets and projects · USA · eia860m

Cedar Hills / 17

Generator · Operations

Metric or conditionSource valueBasis, scope and stage
Nameplate Capacity (MW)0.3 MWOriginal source column definition · Generator · (OP) Operating
As-of date 2026-08
Sources EV-21ffce9bddba81c476b66e6b
Net Summer Capacity (MW)0.3 MWOriginal source column definition · Generator · (OP) Operating
As-of date 2026-08
Sources EV-21ffce9bddba81c476b66e6b
Net Winter Capacity (MW)0.3 MWOriginal source column definition · Generator · (OP) Operating
As-of date 2026-08
Sources EV-21ffce9bddba81c476b66e6b
Detailed source fields
Original source fieldPublished value or condition
Entity ID67614
Entity NameKing County Solid Waste Division
Plant ID57298
Plant NameCedar Hills
Google MapMap
Bing MapMap
Plant StateWA
CountyKing
Balancing Authority CodePSEI
SectorIPP Non-CHP
Generator ID17
Nameplate Capacity (MW)0.3
Net Summer Capacity (MW)0.3
Net Winter Capacity (MW)0.3
TechnologyLandfill Gas
Energy Source CodeLFG
Prime Mover CodeIC
Operating Month4
Operating Year2009
Status(OP) Operating
Latitude47.455833
Longitude-122.0428
Original text(OP) Operating
Coordinate accuracysource_precision_not_independently_surveyed
source_record_idOperating:14676

Parent facility or plant record

Coordinates locate the plant, including when this record describes one generator.

Location: Plant location · not an individual generator location

Sources, reference dates and retrieval dates 2items
eia860 ↗

Data Source 2025 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location 3_1_Generator_Y2025.xlsx#Operable:14674

Sources EV-d47cfbf49cf8852141e46f07
Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 8029365a94addf46901298635bbce1bec1164ba43bbf516e6d792aafdb286782

Usage terms US government public domain

eia860m ↗

Data Source 2026-08 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location Operating:14676

Sources EV-21ffce9bddba81c476b66e6b
Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 4f36143b5e12b7172f8715dc4f88d45c2d969dd706c43b0214b10d25e0c0c373

Usage terms US government public domain

Related power and facility evidence

Loading related evidence…

Other records with the same country and operator label

These source records have not been merged as a confirmed legal entity or campus.

Find related records →

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel