United States of America · Generator · plant location

Cedar Hills / 10

공식 원천의 전력 객체 · Operations

Project stage · source basis
Operation announced · operating
Reported operator
King County Solid Waste Division
Address
Check each original source
Data Reference Date
2026-08
Collection review date
2026-10-05
Location meaning
Plant location · not an individual generator location · Accuracy not disclosed
Coordinates and geometry
47.455833, -122.0428

These are source records. Operator labels do not confirm legal ownership or operations. Map locations do not verify supplying substations, power contracts or current available capacity.

Power assets and projects · USA · eia860m

Cedar Hills / 10

Generator · Operations

Metric or conditionSource valueBasis, scope and stage
Nameplate Capacity (MW)0.3 MWOriginal source column definition · Generator · (OP) Operating
As-of date 2026-08
Sources EV-a92c0bed60c85456a6968dbd
Net Summer Capacity (MW)0.3 MWOriginal source column definition · Generator · (OP) Operating
As-of date 2026-08
Sources EV-a92c0bed60c85456a6968dbd
Net Winter Capacity (MW)0.3 MWOriginal source column definition · Generator · (OP) Operating
As-of date 2026-08
Sources EV-a92c0bed60c85456a6968dbd
Detailed source fields
Original source fieldPublished value or condition
Entity ID67614
Entity NameKing County Solid Waste Division
Plant ID57298
Plant NameCedar Hills
Google MapMap
Bing MapMap
Plant StateWA
CountyKing
Balancing Authority CodePSEI
SectorIPP Non-CHP
Generator ID10
Nameplate Capacity (MW)0.3
Net Summer Capacity (MW)0.3
Net Winter Capacity (MW)0.3
TechnologyLandfill Gas
Energy Source CodeLFG
Prime Mover CodeIC
Operating Month4
Operating Year2009
Status(OP) Operating
Latitude47.455833
Longitude-122.0428
Original text(OP) Operating
Coordinate accuracysource_precision_not_independently_surveyed
source_record_idOperating:14669

Parent facility or plant record

Coordinates locate the plant, including when this record describes one generator.

Location: Plant location · not an individual generator location

Sources, reference dates and retrieval dates 2items
eia860 ↗

Data Source 2025 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location 3_1_Generator_Y2025.xlsx#Operable:14667

Sources EV-7006ec93264437aec3af49aa
Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 a1b2686c5752c49a7aabe85bdf09bbcacc9f8e7c65baec4a192b3a4bb93f1e45

Usage terms US government public domain

eia860m ↗

Data Source 2026-08 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location Operating:14669

Sources EV-a92c0bed60c85456a6968dbd
Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 dcdece4eaa424b0133ca0853da12504acbd5610551cef6ea0f569c1dafdd193f

Usage terms US government public domain

Related power and facility evidence

Loading related evidence…

Other records with the same country and operator label

These source records have not been merged as a confirmed legal entity or campus.

Find related records →

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel