Rumble Road Energy Center / 3B
Generator · Cancelled or postponed
| Metric or condition | Source value | Basis, scope and stage |
|---|---|---|
| Nameplate Capacity (MW) | 220 MW | Original source column definition · Generator · Canceled or Postponed As-of date 2026-08 Sources EV-e03e464c99882e0478252e06 |
| Net Summer Capacity (MW) | 200 MW | Original source column definition · Generator · Canceled or Postponed As-of date 2026-08 Sources EV-e03e464c99882e0478252e06 |
| Net Winter Capacity (MW) | 200 MW | Original source column definition · Generator · Canceled or Postponed As-of date 2026-08 Sources EV-e03e464c99882e0478252e06 |
Detailed source fields
| Original source field | Published value or condition |
|---|---|
| Entity ID | 13994 |
| Entity Name | Oglethorpe Power Corporation |
| Plant ID | 57209 |
| Plant Name | Rumble Road Energy Center |
| Google Map | Map |
| Bing Map | Map |
| Plant State | GA |
| County | Monroe |
| Balancing Authority Code | SOCO |
| Sector | Electric Utility |
| Generator ID | 3B |
| Nameplate Capacity (MW) | 220 |
| Net Summer Capacity (MW) | 200 |
| Net Winter Capacity (MW) | 200 |
| Technology | Natural Gas Fired Combined Cycle |
| Energy Source Code | NG |
| Prime Mover Code | CT |
| Latitude | 32.975833 |
| Longitude | -83.84611 |
| Original text | Canceled or Postponed |
| Coordinate accuracy | source_precision_not_independently_surveyed |
| source_record_id | Canceled or Postponed:515 |
Parent facility or plant record
Coordinates locate the plant, including when this record describes one generator.
Location: Plant location · not an individual generator location
Sources, reference dates and retrieval dates 2items
Data Source 2025 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
Source location 3_1_Generator_Y2025.xlsx#Retired and Canceled:4717
Sources EV-0d34853dbefdc1d7156a3d73Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 4f6b67ebb9d8d1a264b274f6b27ce0fa0978f8dce33a78bec67b6b8f70876f36
Usage terms US government public domain
Data Source 2026-08 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
Source location Canceled or Postponed:515
Sources EV-e03e464c99882e0478252e06Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 107bc366c1d30bf9e822d2fb3b599c28ddb09f7ed8c18b28b7eefb5fc680d6f8
Usage terms US government public domain
