United States of America · Generator · plant location

PPL Glendon LFGTE Plant / 3

공식 원천의 전력 객체 · Cancelled or postponed

Project stage · source basis
Stage requires verification · cancelled_or_postponed
Reported operator
NextEra Renewable Fuels, LLC
Address
Check each original source
Data Reference Date
2026-08
Collection review date
2026-10-05
Location meaning
Plant location · not an individual generator location · Accuracy not disclosed
Coordinates and geometry
40.667778, -75.23222

These are source records. Operator labels do not confirm legal ownership or operations. Map locations do not verify supplying substations, power contracts or current available capacity.

Power assets and projects · USA · eia860m

PPL Glendon LFGTE Plant / 3

Generator · Cancelled or postponed

Metric or conditionSource valueBasis, scope and stage
Nameplate Capacity (MW)1.6 MWOriginal source column definition · Generator · Canceled or Postponed
As-of date 2026-08
Sources EV-67afcc448996d5e4b6114498
Net Summer Capacity (MW)1.6 MWOriginal source column definition · Generator · Canceled or Postponed
As-of date 2026-08
Sources EV-67afcc448996d5e4b6114498
Net Winter Capacity (MW)1.6 MWOriginal source column definition · Generator · Canceled or Postponed
As-of date 2026-08
Sources EV-67afcc448996d5e4b6114498
Detailed source fields
Original source fieldPublished value or condition
Entity ID57249
Entity NameNextEra Renewable Fuels, LLC
Plant ID57183
Plant NamePPL Glendon LFGTE Plant
Google MapMap
Bing MapMap
Plant StatePA
CountyNorthampton
Balancing Authority CodePJM
SectorIPP Non-CHP
Generator ID3
Nameplate Capacity (MW)1.6
Net Summer Capacity (MW)1.6
Net Winter Capacity (MW)1.6
TechnologyLandfill Gas
Energy Source CodeLFG
Prime Mover CodeIC
Latitude40.667778
Longitude-75.23222
Original textCanceled or Postponed
Coordinate accuracysource_precision_not_independently_surveyed
source_record_idCanceled or Postponed:510

Parent facility or plant record

Coordinates locate the plant, including when this record describes one generator.

Location: Plant location · not an individual generator location

Sources, reference dates and retrieval dates 2items
eia860 ↗

Data Source 2025 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location 3_1_Generator_Y2025.xlsx#Retired and Canceled:4708

Sources EV-90b86edc9804e8daffaaa5e7
Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 66f0f8ad36c8cfec163ce489f87f42c9e74a5630411901dd29abfd619338e64c

Usage terms US government public domain

eia860m ↗

Data Source 2026-08 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location Canceled or Postponed:510

Sources EV-67afcc448996d5e4b6114498
Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 b4fef9680b2822c918de0d1edab72c6af4bd03ef4b1f619f9c221d1322944f6c

Usage terms US government public domain

Related power and facility evidence

Loading related evidence…

Other records with the same country and operator label

These source records have not been merged as a confirmed legal entity or campus.

Find related records →

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel