Riverbend Landfill / GEN1
Generator · Out of service
| Metric or condition | Source value | Basis, scope and stage |
|---|---|---|
| Nameplate Capacity (MW) | 0.8 MW | Original source column definition · Generator · (OS) Out of service and NOT expected to return to service in next calendar year As-of date 2026-08 Sources EV-e6524a9403ba9f83925c75d3 |
| Net Summer Capacity (MW) | 0.8 MW | Original source column definition · Generator · (OS) Out of service and NOT expected to return to service in next calendar year As-of date 2026-08 Sources EV-e6524a9403ba9f83925c75d3 |
| Net Winter Capacity (MW) | 0.8 MW | Original source column definition · Generator · (OS) Out of service and NOT expected to return to service in next calendar year As-of date 2026-08 Sources EV-e6524a9403ba9f83925c75d3 |
Detailed source fields
| Original source field | Published value or condition |
|---|---|
| Entity ID | 54842 |
| Entity Name | WM Renewable Energy LLC |
| Plant ID | 57019 |
| Plant Name | Riverbend Landfill |
| Google Map | Map |
| Bing Map | Map |
| Plant State | OR |
| County | Yamhill |
| Balancing Authority Code | BPAT |
| Sector | IPP Non-CHP |
| Generator ID | GEN1 |
| Nameplate Capacity (MW) | 0.8 |
| Net Summer Capacity (MW) | 0.8 |
| Net Winter Capacity (MW) | 0.8 |
| Technology | Landfill Gas |
| Energy Source Code | LFG |
| Prime Mover Code | IC |
| Operating Month | 6 |
| Operating Year | 2010 |
| Status | (OS) Out of service and NOT expected to return to service in next calendar year |
| Latitude | 45.1672 |
| Longitude | -123.2511 |
| Original text | (OS) Out of service and NOT expected to return to service in next calendar year |
| Coordinate accuracy | source_precision_not_independently_surveyed |
| source_record_id | Operating:14315 |
Parent facility or plant record
Coordinates locate the plant, including when this record describes one generator.
Location: Plant location · not an individual generator location
Sources, reference dates and retrieval dates 2items
Data Source 2025 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
Source location 3_1_Generator_Y2025.xlsx#Operable:14311
Sources EV-0a4142674d396e5d53a5f0a6Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 8accf3496cca8a40957ea9242b925fc2b3a5c851888812d9ee1e8b423b55e4d7
Usage terms US government public domain
Data Source 2026-08 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
Source location Operating:14315
Sources EV-e6524a9403ba9f83925c75d3Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 5e0fcbf5ffba9c2c72e52a36b9b44d167f707a97411db4d875985d79b66f6f7c
Usage terms US government public domain
