United States of America · Generator · plant location

Hyland LFGTE Facility / GEN1

공식 원천의 전력 객체 · Retired

Project stage · source basis
Suspended / closed · retired
Reported operator
Casella Waste Systems
Address
Check each original source
Data Reference Date
2026-08
Collection review date
2026-10-05
Location meaning
Plant location · not an individual generator location · Accuracy not disclosed
Coordinates and geometry
42.2853, -78.0061

These are source records. Operator labels do not confirm legal ownership or operations. Map locations do not verify supplying substations, power contracts or current available capacity.

Power assets and projects · USA · eia860m

Hyland LFGTE Facility / GEN1

Generator · Retired

Metric or conditionSource valueBasis, scope and stage
Nameplate Capacity (MW)1.6 MWOriginal source column definition · Generator · Retired
As-of date 2026-08
Sources EV-02e1c4f9e681e5231628d112
Net Summer Capacity (MW)1.6 MWOriginal source column definition · Generator · Retired
As-of date 2026-08
Sources EV-02e1c4f9e681e5231628d112
Net Winter Capacity (MW)1.6 MWOriginal source column definition · Generator · Retired
As-of date 2026-08
Sources EV-02e1c4f9e681e5231628d112
Detailed source fields
Original source fieldPublished value or condition
Entity ID34466
Entity NameCasella Waste Systems
Plant ID56987
Plant NameHyland LFGTE Facility
Google MapMap
Bing MapMap
Plant StateNY
CountyAllegany
Balancing Authority CodeNYIS
SectorIPP Non-CHP
Generator IDGEN1
Nameplate Capacity (MW)1.6
Net Summer Capacity (MW)1.6
Net Winter Capacity (MW)1.6
TechnologyLandfill Gas
Energy Source CodeLFG
Prime Mover CodeIC
Operating Month8
Operating Year2008
Retirement Month6
Retirement Year2025
Latitude42.2853
Longitude-78.0061
Original textRetired
Coordinate accuracysource_precision_not_independently_surveyed
source_record_idRetired:145

Parent facility or plant record

Coordinates locate the plant, including when this record describes one generator.

Location: Plant location · not an individual generator location

Sources, reference dates and retrieval dates 2items
eia860 ↗

Data Source 2025 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location 3_1_Generator_Y2025.xlsx#Retired and Canceled:4644

Sources EV-7d382e45e44c9aa8d0ca3c1d
Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 fbbc2109b3d3eea0e75f5d5a61858efc767bdc6650995008e1871a8139b31b38

Usage terms US government public domain

eia860m ↗

Data Source 2026-08 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location Retired:145

Sources EV-02e1c4f9e681e5231628d112
Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 7dc4b117072c2e649c677d860e4e972b48352662beecceacf430c09781ce1b14

Usage terms US government public domain

Related power and facility evidence

Loading related evidence…

Other records with the same country and operator label

These source records have not been merged as a confirmed legal entity or campus.

Find related records →

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel