United States of America · Generator · plant location

Four Corners Windfarm LLC / 1

공식 원천의 전력 객체 · Operations

Project stage · source basis
Operation announced · operating
Reported operator
Echo 2
Address
Check each original source
Data Reference Date
2026-08
Collection review date
2026-10-05
Location meaning
Plant location · not an individual generator location · Accuracy not disclosed
Coordinates and geometry
45.7286, -119.4181

These are source records. Operator labels do not confirm legal ownership or operations. Map locations do not verify supplying substations, power contracts or current available capacity.

Power assets and projects · USA · eia860m

Four Corners Windfarm LLC / 1

Generator · Operations

Metric or conditionSource valueBasis, scope and stage
Nameplate Capacity (MW)8 MWOriginal source column definition · Generator · (OP) Operating
As-of date 2026-08
Sources EV-4ea1e36bf3d4622b3b973d31
Net Summer Capacity (MW)8 MWOriginal source column definition · Generator · (OP) Operating
As-of date 2026-08
Sources EV-4ea1e36bf3d4622b3b973d31
Net Winter Capacity (MW)8 MWOriginal source column definition · Generator · (OP) Operating
As-of date 2026-08
Sources EV-4ea1e36bf3d4622b3b973d31
Detailed source fields
Original source fieldPublished value or condition
Entity ID56803
Entity NameEcho 2
Plant ID56969
Plant NameFour Corners Windfarm LLC
Google MapMap
Bing MapMap
Plant StateOR
CountyUmatilla
Balancing Authority CodePACW
SectorIPP Non-CHP
Generator ID1
Nameplate Capacity (MW)8
Net Summer Capacity (MW)8
Net Winter Capacity (MW)8
TechnologyOnshore Wind Turbine
Energy Source CodeWND
Prime Mover CodeWT
Operating Month6
Operating Year2009
Status(OP) Operating
Latitude45.7286
Longitude-119.4181
Original text(OP) Operating
Coordinate accuracysource_precision_not_independently_surveyed
source_record_idOperating:14231

Parent facility or plant record

Coordinates locate the plant, including when this record describes one generator.

Location: Plant location · not an individual generator location

Sources, reference dates and retrieval dates 2items
eia860 ↗

Data Source 2025 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location 3_1_Generator_Y2025.xlsx#Operable:14227

Sources EV-e73d2c13e6d9ee3820ff0682
Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 0c477192daf2d0a03103fca3148d93d01d7928325cc3d1506b63c03755c6aceb

Usage terms US government public domain

eia860m ↗

Data Source 2026-08 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location Operating:14231

Sources EV-4ea1e36bf3d4622b3b973d31
Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 8fbee7148cf69902a63d5d46ced71b554ce1b1005affe42dd459f3836e8cfb75

Usage terms US government public domain

Related power and facility evidence

Loading related evidence…

Other records with the same country and operator label

These source records have not been merged as a confirmed legal entity or campus.

Find related records →

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel