Coolidge Generation Station / COE23
Generator · Plan
| Metric or condition | Source value | Basis, scope and stage |
|---|---|---|
| Nameplate Capacity (MW) | 49.5 MW | Original source column definition · Generator · (U) Under construction, less than or equal to 50 percent complete As-of date 2026-08 Sources EV-1df5ea81d8f4cfee8143adf5 |
| Net Summer Capacity (MW) | 42 MW | Original source column definition · Generator · (U) Under construction, less than or equal to 50 percent complete As-of date 2026-08 Sources EV-1df5ea81d8f4cfee8143adf5 |
| Net Winter Capacity (MW) | 48 MW | Original source column definition · Generator · (U) Under construction, less than or equal to 50 percent complete As-of date 2026-08 Sources EV-1df5ea81d8f4cfee8143adf5 |
Detailed source fields
| Original source field | Published value or condition |
|---|---|
| Entity ID | 16572 |
| Entity Name | Salt River Project |
| Plant ID | 56948 |
| Plant Name | Coolidge Generation Station |
| Google Map | Map |
| Bing Map | Map |
| Plant State | AZ |
| County | Pinal |
| Balancing Authority Code | SRP |
| Sector | Electric Utility |
| Generator ID | COE23 |
| Nameplate Capacity (MW) | 49.5 |
| Net Summer Capacity (MW) | 42 |
| Net Winter Capacity (MW) | 48 |
| Technology | Natural Gas Fired Combustion Turbine |
| Energy Source Code | NG |
| Prime Mover Code | GT |
| Planned Operation Month | 7 |
| Planned Operation Year | 2027 |
| Status | (U) Under construction, less than or equal to 50 percent complete |
| Latitude | 32.917399 |
| Longitude | -111.5033 |
| Original text | (U) Under construction, less than or equal to 50 percent complete |
| Coordinate accuracy | source_precision_not_independently_surveyed |
| source_record_id | Planned:912 |
Parent facility or plant record
Coordinates locate the plant, including when this record describes one generator.
Location: Plant location · not an individual generator location
Sources, reference dates and retrieval dates 2items
Data Source 2025 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
Source location 3_1_Generator_Y2025.xlsx#Proposed:197
Sources EV-91b875956f136d4d998ad06bEvidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 00867eade666a9ca641712d469a5b6ff8c718279835d22c41bbad4f2cfd374b6
Usage terms US government public domain
Data Source 2026-08 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
Source location Planned:912
Sources EV-1df5ea81d8f4cfee8143adf5Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 a2a3d95edecc8dae70845d8239bb3d1b6a9eb87eb175f837623bcbeadc6cdbc3
Usage terms US government public domain