United States of America · Generator · plant location

Marengo Wind Plant / 1

공식 원천의 전력 객체 · Operations

Project stage · source basis
Operation announced · operating
Reported operator
PacifiCorp
Address
Check each original source
Data Reference Date
2026-08
Collection review date
2026-10-05
Location meaning
Plant location · not an individual generator location · Accuracy not disclosed
Coordinates and geometry
46.3747, -117.7772

These are source records. Operator labels do not confirm legal ownership or operations. Map locations do not verify supplying substations, power contracts or current available capacity.

Power assets and projects · USA · eia860m

Marengo Wind Plant / 1

Generator · Operations

Metric or conditionSource valueBasis, scope and stage
Nameplate Capacity (MW)156 MWOriginal source column definition · Generator · (OP) Operating
As-of date 2026-08
Sources EV-a0d9bd479cfae3865f2c6ed4
Net Summer Capacity (MW)156 MWOriginal source column definition · Generator · (OP) Operating
As-of date 2026-08
Sources EV-a0d9bd479cfae3865f2c6ed4
Net Winter Capacity (MW)156 MWOriginal source column definition · Generator · (OP) Operating
As-of date 2026-08
Sources EV-a0d9bd479cfae3865f2c6ed4
Detailed source fields
Original source fieldPublished value or condition
Entity ID14354
Entity NamePacifiCorp
Plant ID56466
Plant NameMarengo Wind Plant
Google MapMap
Bing MapMap
Plant StateWA
CountyColumbia
Balancing Authority CodePACW
SectorElectric Utility
Generator ID1
Nameplate Capacity (MW)156
Net Summer Capacity (MW)156
Net Winter Capacity (MW)156
TechnologyOnshore Wind Turbine
Energy Source CodeWND
Prime Mover CodeWT
Operating Month8
Operating Year2007
Status(OP) Operating
Latitude46.3747
Longitude-117.7772
Original text(OP) Operating
Coordinate accuracysource_precision_not_independently_surveyed
source_record_idOperating:13253

Parent facility or plant record

Coordinates locate the plant, including when this record describes one generator.

Location: Plant location · not an individual generator location

Sources, reference dates and retrieval dates 2items
eia860 ↗

Data Source 2025 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location 3_1_Generator_Y2025.xlsx#Operable:13256

Sources EV-d57cfd0c8c16197868f91b01
Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 1edf447478de811bec9cab280a2e4f8d6034e193134e002ede3ab74d12398f64

Usage terms US government public domain

eia860m ↗

Data Source 2026-08 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location Operating:13253

Sources EV-a0d9bd479cfae3865f2c6ed4
Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 163b8e4c4e1f0c396ec85ac6c3b88a1c341ab2a3082e03b35b8e050d03dc89ca

Usage terms US government public domain

Related power and facility evidence

Loading related evidence…

Other records with the same country and operator label

These source records have not been merged as a confirmed legal entity or campus.

Find related records →

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel