United States of America · Generator · plant location

Twin Buttes Wind Project / WT1

공식 원천의 전력 객체 · Operations

Project stage · source basis
Operation announced · operating
Reported operator
Avangrid Power LLC
Address
Check each original source
Data Reference Date
2026-08
Collection review date
2026-10-05
Location meaning
Plant location · not an individual generator location · Accuracy not disclosed
Coordinates and geometry
37.6735, -102.8622

These are source records. Operator labels do not confirm legal ownership or operations. Map locations do not verify supplying substations, power contracts or current available capacity.

Power assets and projects · USA · eia860m

Twin Buttes Wind Project / WT1

Generator · Operations

Metric or conditionSource valueBasis, scope and stage
Nameplate Capacity (MW)75 MWOriginal source column definition · Generator · (OP) Operating
As-of date 2026-08
Sources EV-18e21a34364f7ba506dec7d8
Net Summer Capacity (MW)75 MWOriginal source column definition · Generator · (OP) Operating
As-of date 2026-08
Sources EV-18e21a34364f7ba506dec7d8
Net Winter Capacity (MW)75 MWOriginal source column definition · Generator · (OP) Operating
As-of date 2026-08
Sources EV-18e21a34364f7ba506dec7d8
Detailed source fields
Original source fieldPublished value or condition
Entity ID15399
Entity NameAvangrid Power LLC
Plant ID56460
Plant NameTwin Buttes Wind Project
Google MapMap
Bing MapMap
Plant StateCO
CountyBent
Balancing Authority CodePSCO
SectorIPP Non-CHP
Generator IDWT1
Nameplate Capacity (MW)75
Net Summer Capacity (MW)75
Net Winter Capacity (MW)75
TechnologyOnshore Wind Turbine
Energy Source CodeWND
Prime Mover CodeWT
Operating Month7
Operating Year2007
Status(OP) Operating
Latitude37.6735
Longitude-102.8622
Original text(OP) Operating
Coordinate accuracysource_precision_not_independently_surveyed
source_record_idOperating:13227

Parent facility or plant record

Coordinates locate the plant, including when this record describes one generator.

Location: Plant location · not an individual generator location

Sources, reference dates and retrieval dates 2items
eia860 ↗

Data Source 2025 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location 3_1_Generator_Y2025.xlsx#Operable:13228

Sources EV-f47ece6f3207d666d61354f8
Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 0913eb2ae6460f885f2dc21bfa08952631c26e6cefd2f6d30ec760a9522a3d5f

Usage terms US government public domain

eia860m ↗

Data Source 2026-08 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location Operating:13227

Sources EV-18e21a34364f7ba506dec7d8
Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 7559251f779eda70353d31df54b6eaaf4d4635068d54ede04bae989e41ea5e1e

Usage terms US government public domain

Related power and facility evidence

Loading related evidence…

Other records with the same country and operator label

These source records have not been merged as a confirmed legal entity or campus.

Find related records →

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel