United States of America · Generator · plant location

Ecogen Wind / 1

공식 원천의 전력 객체 · Cancelled or postponed

Project stage · source basis
Stage requires verification · cancelled_or_postponed
Reported operator
Pattern Operators LP
Address
Check each original source
Data Reference Date
2026-08
Collection review date
2026-10-05
Location meaning
Plant location · not an individual generator location · Accuracy not disclosed
Coordinates and geometry
42.586944, -77.3125

These are source records. Operator labels do not confirm legal ownership or operations. Map locations do not verify supplying substations, power contracts or current available capacity.

Power assets and projects · USA · eia860m

Ecogen Wind / 1

Generator · Cancelled or postponed

Metric or conditionSource valueBasis, scope and stage
Nameplate Capacity (MW)272 MWOriginal source column definition · Generator · Canceled or Postponed
As-of date 2026-08
Sources EV-e9b33f9670de5c2c4f7b9ee0
Net Summer Capacity (MW)272 MWOriginal source column definition · Generator · Canceled or Postponed
As-of date 2026-08
Sources EV-e9b33f9670de5c2c4f7b9ee0
Net Winter Capacity (MW)272 MWOriginal source column definition · Generator · Canceled or Postponed
As-of date 2026-08
Sources EV-e9b33f9670de5c2c4f7b9ee0
Detailed source fields
Original source fieldPublished value or condition
Entity ID56545
Entity NamePattern Operators LP
Plant ID56370
Plant NameEcogen Wind
Google MapMap
Bing MapMap
Plant StateNY
CountySteuben
Balancing Authority CodeNYIS
SectorIPP Non-CHP
Generator ID1
Nameplate Capacity (MW)272
Net Summer Capacity (MW)272
Net Winter Capacity (MW)272
TechnologyOnshore Wind Turbine
Energy Source CodeWND
Prime Mover CodeWT
Latitude42.586944
Longitude-77.3125
Original textCanceled or Postponed
Coordinate accuracysource_precision_not_independently_surveyed
source_record_idCanceled or Postponed:423

Parent facility or plant record

Coordinates locate the plant, including when this record describes one generator.

Location: Plant location · not an individual generator location

Sources, reference dates and retrieval dates 2items
eia860 ↗

Data Source 2025 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location 3_1_Generator_Y2025.xlsx#Retired and Canceled:4439

Sources EV-d32f3c8818fe5477eb6e8270
Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 e49386b39875f056aa65d95ee521cef951528b5c8ce9faf5c2f55a5687f106e9

Usage terms US government public domain

eia860m ↗

Data Source 2026-08 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location Canceled or Postponed:423

Sources EV-e9b33f9670de5c2c4f7b9ee0
Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 cba09aab4dc68760021e2efa3d3f9cd1fb291262504c777d56e9c83bdb606339

Usage terms US government public domain

Related power and facility evidence

Loading related evidence…

Other records with the same country and operator label

These source records have not been merged as a confirmed legal entity or campus.

Find related records →

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel