Middletown / 2
Generator · Out of service
| Metric or condition | Source value | Basis, scope and stage |
|---|---|---|
| Nameplate Capacity (MW) | 113.6 MW | Original source column definition · Generator · (OS) Out of service and NOT expected to return to service in next calendar year As-of date 2026-08 Sources EV-68a1c9a987ad40ebc0186284 |
| Net Summer Capacity (MW) | 117 MW | Original source column definition · Generator · (OS) Out of service and NOT expected to return to service in next calendar year As-of date 2026-08 Sources EV-68a1c9a987ad40ebc0186284 |
| Net Winter Capacity (MW) | 120 MW | Original source column definition · Generator · (OS) Out of service and NOT expected to return to service in next calendar year As-of date 2026-08 Sources EV-68a1c9a987ad40ebc0186284 |
Detailed source fields
| Original source field | Published value or condition |
|---|---|
| Entity ID | 12490 |
| Entity Name | Middletown Power LLC |
| Plant ID | 562 |
| Plant Name | Middletown |
| Google Map | Map |
| Bing Map | Map |
| Plant State | CT |
| County | Middlesex |
| Balancing Authority Code | ISNE |
| Sector | IPP Non-CHP |
| Generator ID | 2 |
| Nameplate Capacity (MW) | 113.6 |
| Net Summer Capacity (MW) | 117 |
| Net Winter Capacity (MW) | 120 |
| Technology | Natural Gas Steam Turbine |
| Energy Source Code | NG |
| Prime Mover Code | ST |
| Operating Month | 10 |
| Operating Year | 1958 |
| Status | (OS) Out of service and NOT expected to return to service in next calendar year |
| Latitude | 41.554944 |
| Longitude | -72.57908 |
| Original text | (OS) Out of service and NOT expected to return to service in next calendar year |
| Coordinate accuracy | source_precision_not_independently_surveyed |
| source_record_id | Operating:955 |
Parent facility or plant record
Coordinates locate the plant, including when this record describes one generator.
Location: Plant location · not an individual generator location
Sources, reference dates and retrieval dates 2items
Data Source 2025 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
Source location 3_1_Generator_Y2025.xlsx#Operable:949
Sources EV-1aa60404f60660fe08bc2a5eEvidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 094186084a293876a1f805064633a6f42c658dfc996948a636e1227ae092e9b6
Usage terms US government public domain
Data Source 2026-08 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
Source location Operating:955
Sources EV-68a1c9a987ad40ebc0186284Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 32bd704c787083eea17c8c343ba789e268c6dc3419f8722a1a98251256fc5aa4
Usage terms US government public domain
