Lange Generating Station / IC05
Generator · Plan
| Metric or condition | Source value | Basis, scope and stage |
|---|---|---|
| Nameplate Capacity (MW) | 16.6 MW | Original source column definition · Generator · (V) Under construction, more than 50 percent complete As-of date 2026-08 Sources EV-3178639f291e2f97c309a146 |
| Net Summer Capacity (MW) | 16.3 MW | Original source column definition · Generator · (V) Under construction, more than 50 percent complete As-of date 2026-08 Sources EV-3178639f291e2f97c309a146 |
| Net Winter Capacity (MW) | 16.3 MW | Original source column definition · Generator · (V) Under construction, more than 50 percent complete As-of date 2026-08 Sources EV-3178639f291e2f97c309a146 |
Detailed source fields
| Original source field | Published value or condition |
|---|---|
| Entity ID | 19545 |
| Entity Name | Black Hills Power, Inc. |
| Plant ID | 55478 |
| Plant Name | Lange Generating Station |
| Google Map | Map |
| Bing Map | Map |
| Plant State | SD |
| County | Pennington |
| Balancing Authority Code | WACM |
| Sector | Electric Utility |
| Generator ID | IC05 |
| Nameplate Capacity (MW) | 16.6 |
| Net Summer Capacity (MW) | 16.3 |
| Net Winter Capacity (MW) | 16.3 |
| Technology | Natural Gas Internal Combustion Engine |
| Energy Source Code | NG |
| Prime Mover Code | IC |
| Planned Operation Month | 12 |
| Planned Operation Year | 2026 |
| Status | (V) Under construction, more than 50 percent complete |
| Latitude | 44.1218 |
| Longitude | -103.2641 |
| Original text | (V) Under construction, more than 50 percent complete |
| Coordinate accuracy | source_precision_not_independently_surveyed |
| source_record_id | Planned:439 |
Parent facility or plant record
Coordinates locate the plant, including when this record describes one generator.
Location: Plant location · not an individual generator location
Sources, reference dates and retrieval dates 2items
Data Source 2025 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
Source location 3_1_Generator_Y2025.xlsx#Proposed:179
Sources EV-168c5c29f6d4aafc95dca0b1Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 59a17c1eb59ce02d7352692f40cd37c8aa433259c1aaa89fc97eb970b2c38742
Usage terms US government public domain
Data Source 2026-08 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
Source location Planned:439
Sources EV-3178639f291e2f97c309a146Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 725c31cda1b225ae2be9e6aad99167e0dab036595f44c680f176a9a7a2ad04f2
Usage terms US government public domain
