Red Hawk / CT7
Generator · Plan
| Metric or condition | Source value | Basis, scope and stage |
|---|---|---|
| Nameplate Capacity (MW) | 49 MW | Original source column definition · Generator · (U) Under construction, less than or equal to 50 percent complete As-of date 2026-08 Sources EV-fbf02c5f2e1df9d8f803278d |
| Net Summer Capacity (MW) | 45 MW | Original source column definition · Generator · (U) Under construction, less than or equal to 50 percent complete As-of date 2026-08 Sources EV-fbf02c5f2e1df9d8f803278d |
| Net Winter Capacity (MW) | 49 MW | Original source column definition · Generator · (U) Under construction, less than or equal to 50 percent complete As-of date 2026-08 Sources EV-fbf02c5f2e1df9d8f803278d |
Detailed source fields
| Original source field | Published value or condition |
|---|---|
| Entity ID | 803 |
| Entity Name | Arizona Public Service Co |
| Plant ID | 55455 |
| Plant Name | Red Hawk |
| Google Map | Map |
| Bing Map | Map |
| Plant State | AZ |
| County | Maricopa |
| Balancing Authority Code | SRP |
| Sector | Electric Utility |
| Generator ID | CT7 |
| Nameplate Capacity (MW) | 49 |
| Net Summer Capacity (MW) | 45 |
| Net Winter Capacity (MW) | 49 |
| Technology | Natural Gas Fired Combustion Turbine |
| Energy Source Code | NG |
| Prime Mover Code | GT |
| Planned Operation Month | 10 |
| Planned Operation Year | 2027 |
| Status | (U) Under construction, less than or equal to 50 percent complete |
| Latitude | 33.334562 |
| Longitude | -112.8406 |
| Original text | (U) Under construction, less than or equal to 50 percent complete |
| Coordinate accuracy | source_precision_not_independently_surveyed |
| source_record_id | Planned:1069 |
Parent facility or plant record
Coordinates locate the plant, including when this record describes one generator.
Location: Plant location · not an individual generator location
Sources, reference dates and retrieval dates 2items
Data Source 2025 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
Source location 3_1_Generator_Y2025.xlsx#Proposed:172
Sources EV-640a985ec69bacfc8da5ccbaEvidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 4683dcc70de8205a784eeb13eefc1bcf885480167b256e4dc0aff0454dcb4f0a
Usage terms US government public domain
Data Source 2026-08 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
Source location Planned:1069
Sources EV-fbf02c5f2e1df9d8f803278dEvidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 a8a91ad4a92548ec140edbcb884353059c3e035610dbc1d132d15f592319200d
Usage terms US government public domain