United States of America · Generator · plant location

ANP Blackstone Energy Project / U1

공식 원천의 전력 객체 · Operations

Project stage · source basis
Operation announced · operating
Reported operator
ANP Blackstone Energy Company LLC
Address
Check each original source
Data Reference Date
2025
Collection review date
2026-10-05
Location meaning
Plant location · not an individual generator location · Accuracy not disclosed
Coordinates and geometry
42.059876, -71.51581

These are source records. Operator labels do not confirm legal ownership or operations. Map locations do not verify supplying substations, power contracts or current available capacity.

Power assets and projects · USA · eia860m

ANP Blackstone Energy Project / U1

Generator · Operations

Metric or conditionSource valueBasis, scope and stage
Nameplate Capacity (MW)289 MWOriginal source column definition · Generator · (OP) Operating
As-of date 2026-08
Sources EV-3ac55f7a4f96359a2242b742
Net Summer Capacity (MW)239.8 MWOriginal source column definition · Generator · (OP) Operating
As-of date 2026-08
Sources EV-3ac55f7a4f96359a2242b742
Net Winter Capacity (MW)276.9 MWOriginal source column definition · Generator · (OP) Operating
As-of date 2026-08
Sources EV-3ac55f7a4f96359a2242b742
Detailed source fields
Original source fieldPublished value or condition
Entity ID656
Entity NameANP Blackstone Energy Company LLC
Plant ID55212
Plant NameANP Blackstone Energy Project
Google MapMap
Bing MapMap
Plant StateMA
CountyWorcester
Balancing Authority CodeISNE
SectorIPP Non-CHP
Generator IDU1
Nameplate Capacity (MW)289
Net Summer Capacity (MW)239.8
Net Winter Capacity (MW)276.9
TechnologyNatural Gas Fired Combined Cycle
Energy Source CodeNG
Prime Mover CodeCS
Operating Month6
Operating Year2001
Status(OP) Operating
Latitude42.059876
Longitude-71.51581
Original text(OP) Operating
Coordinate accuracysource_precision_not_independently_surveyed
source_record_idOperating:11601

Parent facility or plant record

Coordinates locate the plant, including when this record describes one generator.

Location: Plant location · not an individual generator location

Sources, reference dates and retrieval dates 2items
eia860 ↗

Data Source 2025 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location 3_1_Generator_Y2025.xlsx#Operable:11601

Sources EV-0032e89c57013dd01d0edcfe
Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 407996601b273db23601dcff348c7f1abba8bd865e27bd7790fbee657cd79a75

Usage terms US government public domain

eia860m ↗

Data Source 2026-08 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location Operating:11601

Sources EV-3ac55f7a4f96359a2242b742
Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 348c84a8284a978aff938dce08ca3819bb603f49367939233adafd3417897564

Usage terms US government public domain

Related power and facility evidence

Loading related evidence…

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel