United States of America · Generator · plant location

Afton Generating Station / 0002

공식 원천의 전력 객체 · Operations

Project stage · source basis
Operation announced · operating
Reported operator
Public Service Co of NM
Address
Check each original source
Data Reference Date
2026-08
Collection review date
2026-10-05
Location meaning
Plant location · not an individual generator location · Accuracy not disclosed
Coordinates and geometry
32.114185, -106.8465

These are source records. Operator labels do not confirm legal ownership or operations. Map locations do not verify supplying substations, power contracts or current available capacity.

Power assets and projects · USA · eia860m

Afton Generating Station / 0002

Generator · Operations

Metric or conditionSource valueBasis, scope and stage
Nameplate Capacity (MW)110 MWOriginal source column definition · Generator · (OP) Operating
As-of date 2026-08
Sources EV-d221621ba7aee869b07fc714
Net Summer Capacity (MW)94.6 MWOriginal source column definition · Generator · (OP) Operating
As-of date 2026-08
Sources EV-d221621ba7aee869b07fc714
Net Winter Capacity (MW)103.4 MWOriginal source column definition · Generator · (OP) Operating
As-of date 2026-08
Sources EV-d221621ba7aee869b07fc714
Detailed source fields
Original source fieldPublished value or condition
Entity ID15473
Entity NamePublic Service Co of NM
Plant ID55210
Plant NameAfton Generating Station
Google MapMap
Bing MapMap
Plant StateNM
CountyDona Ana
Balancing Authority CodePNM
SectorElectric Utility
Generator ID0002
Unit CodeCC1
Nameplate Capacity (MW)110
Net Summer Capacity (MW)94.6
Net Winter Capacity (MW)103.4
TechnologyNatural Gas Fired Combined Cycle
Energy Source CodeNG
Prime Mover CodeCA
Operating Month10
Operating Year2007
Status(OP) Operating
Latitude32.114185
Longitude-106.8465
Original text(OP) Operating
Coordinate accuracysource_precision_not_independently_surveyed
source_record_idOperating:11598

Parent facility or plant record

Coordinates locate the plant, including when this record describes one generator.

Location: Plant location · not an individual generator location

Sources, reference dates and retrieval dates 2items
eia860 ↗

Data Source 2025 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location 3_1_Generator_Y2025.xlsx#Operable:11598

Sources EV-0f1a0e14741c46aef4b2a9d5
Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 e15cc5160b78b6f7c0238115f51583d09bc8727d8eef88e225da88b8aae56062

Usage terms US government public domain

eia860m ↗

Data Source 2026-08 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location Operating:11598

Sources EV-d221621ba7aee869b07fc714
Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 1992d33c3b1c096d8ff1a4260ea61f4b551b3e3f251e7db8872cd44482fe14a9

Usage terms US government public domain

Related power and facility evidence

Loading related evidence…

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel