Hawk Road Facility / CT3
Generator · Operations
| Metric or condition | Source value | Basis, scope and stage |
|---|---|---|
| Nameplate Capacity (MW) | 165 MW | Original source column definition · Generator · (OP) Operating As-of date 2026-08 Sources EV-4f13300b6613f19240663d5b |
| Net Summer Capacity (MW) | 147.2 MW | Original source column definition · Generator · (OP) Operating As-of date 2026-08 Sources EV-4f13300b6613f19240663d5b |
| Net Winter Capacity (MW) | 181.3 MW | Original source column definition · Generator · (OP) Operating As-of date 2026-08 Sources EV-4f13300b6613f19240663d5b |
Detailed source fields
| Original source field | Published value or condition |
|---|---|
| Entity ID | 13994 |
| Entity Name | Oglethorpe Power Corporation |
| Plant ID | 55141 |
| Plant Name | Hawk Road Facility |
| Google Map | Map |
| Bing Map | Map |
| Plant State | GA |
| County | Heard |
| Balancing Authority Code | SOCO |
| Sector | Electric Utility |
| Generator ID | CT3 |
| Nameplate Capacity (MW) | 165 |
| Net Summer Capacity (MW) | 147.2 |
| Net Winter Capacity (MW) | 181.3 |
| Technology | Natural Gas Fired Combustion Turbine |
| Energy Source Code | NG |
| Prime Mover Code | GT |
| Operating Month | 5 |
| Operating Year | 2001 |
| Status | (OP) Operating |
| Latitude | 33.358472 |
| Longitude | -84.99139 |
| Original text | (OP) Operating |
| Coordinate accuracy | source_precision_not_independently_surveyed |
| source_record_id | Operating:11459 |
Parent facility or plant record
Coordinates locate the plant, including when this record describes one generator.
Location: Plant location · not an individual generator location
Sources, reference dates and retrieval dates 2items
Data Source 2025 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
Source location 3_1_Generator_Y2025.xlsx#Operable:11459
Sources EV-7803812fda5e6ec92dc929a0Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 32049d5d9ad29a9e5994d726a2c2caadee1e231c22252b6b13cda7e0f655a007
Usage terms US government public domain
Data Source 2026-08 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
Source location Operating:11459
Sources EV-4f13300b6613f19240663d5bEvidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 c030c010f9d169332696ed7c1c7307972569df859d52d37041ec9fcb8b5a7352
Usage terms US government public domain
