United States of America · Generator · plant location

Brownsville Peaking Power / 1

공식 원천의 전력 객체 · Operations

Project stage · source basis
Operation announced · operating
Reported operator
Tennessee Valley Authority
Address
Check each original source
Data Reference Date
2026-08
Collection review date
2026-10-05
Location meaning
Plant location · not an individual generator location · Accuracy not disclosed
Coordinates and geometry
35.5438, -89.198

These are source records. Operator labels do not confirm legal ownership or operations. Map locations do not verify supplying substations, power contracts or current available capacity.

Power assets and projects · USA · eia860m

Brownsville Peaking Power / 1

Generator · Operations

Metric or conditionSource valueBasis, scope and stage
Nameplate Capacity (MW)112 MWOriginal source column definition · Generator · (OP) Operating
As-of date 2026-08
Sources EV-bc902f4dd770cbb300a67135
Net Summer Capacity (MW)110 MWOriginal source column definition · Generator · (OP) Operating
As-of date 2026-08
Sources EV-bc902f4dd770cbb300a67135
Net Winter Capacity (MW)124 MWOriginal source column definition · Generator · (OP) Operating
As-of date 2026-08
Sources EV-bc902f4dd770cbb300a67135
Detailed source fields
Original source fieldPublished value or condition
Entity ID18642
Entity NameTennessee Valley Authority
Plant ID55081
Plant NameBrownsville Peaking Power
Google MapMap
Bing MapMap
Plant StateTN
CountyHaywood
Balancing Authority CodeTVA
SectorElectric Utility
Generator ID1
Nameplate Capacity (MW)112
Net Summer Capacity (MW)110
Net Winter Capacity (MW)124
TechnologyNatural Gas Fired Combustion Turbine
Energy Source CodeNG
Prime Mover CodeGT
Operating Month6
Operating Year1999
Status(OP) Operating
Latitude35.5438
Longitude-89.198
Original text(OP) Operating
Coordinate accuracysource_precision_not_independently_surveyed
source_record_idOperating:11319

Parent facility or plant record

Coordinates locate the plant, including when this record describes one generator.

Location: Plant location · not an individual generator location

Sources, reference dates and retrieval dates 2items
eia860 ↗

Data Source 2025 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location 3_1_Generator_Y2025.xlsx#Operable:11319

Sources EV-b0f489efdb37ca8499da0a4e
Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 a1381882b078549a1ebdf7852af538c95045c630fe2a0a3266100caf2ef14bac

Usage terms US government public domain

eia860m ↗

Data Source 2026-08 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location Operating:11319

Sources EV-bc902f4dd770cbb300a67135
Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 46a15adc80408a3e42b7d562978553683512684e58f7c29d73aa03a3c0d8c91d

Usage terms US government public domain

Related power and facility evidence

Loading related evidence…

Other records with the same country and operator label

These source records have not been merged as a confirmed legal entity or campus.

Find related records →

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel