Seneca Energy / GE22
Generator · Cancelled or postponed
| Metric or condition | Source value | Basis, scope and stage |
|---|---|---|
| Nameplate Capacity (MW) | 1.6 MW | Original source column definition · Generator · Canceled or Postponed As-of date 2026-08 Sources EV-b616f4c12937a44b49a5d853 |
| Net Summer Capacity (MW) | 1.6 MW | Original source column definition · Generator · Canceled or Postponed As-of date 2026-08 Sources EV-b616f4c12937a44b49a5d853 |
| Net Winter Capacity (MW) | 1.6 MW | Original source column definition · Generator · Canceled or Postponed As-of date 2026-08 Sources EV-b616f4c12937a44b49a5d853 |
Detailed source fields
| Original source field | Published value or condition |
|---|---|
| Entity ID | 17283 |
| Entity Name | Seneca Energy II |
| Plant ID | 54782 |
| Plant Name | Seneca Energy |
| Google Map | Map |
| Bing Map | Map |
| Plant State | NY |
| County | Seneca |
| Balancing Authority Code | NYIS |
| Sector | IPP Non-CHP |
| Generator ID | GE22 |
| Nameplate Capacity (MW) | 1.6 |
| Net Summer Capacity (MW) | 1.6 |
| Net Winter Capacity (MW) | 1.6 |
| Technology | Landfill Gas |
| Energy Source Code | LFG |
| Prime Mover Code | IC |
| Latitude | 42.9281 |
| Longitude | -76.8408 |
| Original text | Canceled or Postponed |
| Coordinate accuracy | source_precision_not_independently_surveyed |
| source_record_id | Canceled or Postponed:262 |
Parent facility or plant record
Coordinates locate the plant, including when this record describes one generator.
Location: Plant location · not an individual generator location
Sources, reference dates and retrieval dates 2items
Data Source 2025 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
Source location 3_1_Generator_Y2025.xlsx#Retired and Canceled:4033
Sources EV-3b53574537ac42fd77d9fb96Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 41e9fde6055500f0f44b4697ef75da02e79da1421b908dc9d6813064a5325081
Usage terms US government public domain
Data Source 2026-08 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
Source location Canceled or Postponed:262
Sources EV-b616f4c12937a44b49a5d853Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 ffb0ba49cb80fc87fe6589e19b7749e083a75365aebf8e114a05b9df44c9f3c5
Usage terms US government public domain
