Norway Point Hydropower Project / 1
Generator · Operations
| Metric or condition | Source value | Basis, scope and stage |
|---|---|---|
| Nameplate Capacity (MW) | 2.8 MW | Original source column definition · Generator · (OP) Operating As-of date 2026-08 Sources EV-1c18142badbc45e61f6c5786 |
| Net Summer Capacity (MW) | 2.8 MW | Original source column definition · Generator · (OP) Operating As-of date 2026-08 Sources EV-1c18142badbc45e61f6c5786 |
| Net Winter Capacity (MW) | 2.8 MW | Original source column definition · Generator · (OP) Operating As-of date 2026-08 Sources EV-1c18142badbc45e61f6c5786 |
Detailed source fields
| Original source field | Published value or condition |
|---|---|
| Entity ID | 57280 |
| Entity Name | Eagle Creek Renewable Energy, LLC |
| Plant ID | 54340 |
| Plant Name | Norway Point Hydropower Project |
| Google Map | Map |
| Bing Map | Map |
| Plant State | MI |
| County | Alpena |
| Balancing Authority Code | MISO |
| Sector | IPP Non-CHP |
| Generator ID | 1 |
| Nameplate Capacity (MW) | 2.8 |
| Net Summer Capacity (MW) | 2.8 |
| Net Winter Capacity (MW) | 2.8 |
| Technology | Conventional Hydroelectric |
| Energy Source Code | WAT |
| Prime Mover Code | HY |
| Operating Month | 9 |
| Operating Year | 1990 |
| Status | (OP) Operating |
| Latitude | 45.1025 |
| Longitude | -83.5189 |
| Original text | (OP) Operating |
| Coordinate accuracy | source_precision_not_independently_surveyed |
| source_record_id | Operating:10407 |
Parent facility or plant record
Coordinates locate the plant, including when this record describes one generator.
Location: Plant location · not an individual generator location
Sources, reference dates and retrieval dates 2items
Data Source 2025 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
Source location 3_1_Generator_Y2025.xlsx#Operable:10404
Sources EV-e8f885730fa55195d0fa6b3aEvidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 419e28aa4c586d95c6ab977d5f9c6bdc8fd76b272931b36e77399e3af2dbdc3c
Usage terms US government public domain
Data Source 2026-08 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
Source location Operating:10407
Sources EV-1c18142badbc45e61f6c5786Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 ded5235103226fd8084d53c2c509e3a789a9d97501d17b582d6acdb0b8a57b93
Usage terms US government public domain
