Archer Daniels Midland Southport / GEN2
Generator · Standby
| Metric or condition | Source value | Basis, scope and stage |
|---|---|---|
| Nameplate Capacity (MW) | 17.5 MW | Original source column definition · Generator · (SB) Standby/Backup: available for service but not normally used As-of date 2026-08 Sources EV-b5c4e35f6bebfb54ba6a1b56 |
| Net Summer Capacity (MW) | 15 MW | Original source column definition · Generator · (SB) Standby/Backup: available for service but not normally used As-of date 2026-08 Sources EV-b5c4e35f6bebfb54ba6a1b56 |
| Net Winter Capacity (MW) | 17.5 MW | Original source column definition · Generator · (SB) Standby/Backup: available for service but not normally used As-of date 2026-08 Sources EV-b5c4e35f6bebfb54ba6a1b56 |
Detailed source fields
| Original source field | Published value or condition |
|---|---|
| Entity ID | 772 |
| Entity Name | Archer Daniels Midland Co |
| Plant ID | 54316 |
| Plant Name | Archer Daniels Midland Southport |
| Google Map | Map |
| Bing Map | Map |
| Plant State | NC |
| County | Brunswick |
| Balancing Authority Code | CPLE |
| Sector | Industrial CHP |
| Generator ID | GEN2 |
| Nameplate Capacity (MW) | 17.5 |
| Net Summer Capacity (MW) | 15 |
| Net Winter Capacity (MW) | 17.5 |
| Technology | Natural Gas Fired Combustion Turbine |
| Energy Source Code | NG |
| Prime Mover Code | GT |
| Operating Month | 10 |
| Operating Year | 1992 |
| Status | (SB) Standby/Backup: available for service but not normally used |
| Latitude | 33.9397 |
| Longitude | -77.9905 |
| Original text | (SB) Standby/Backup: available for service but not normally used |
| Coordinate accuracy | source_precision_not_independently_surveyed |
| source_record_id | Operating:10387 |
Parent facility or plant record
Coordinates locate the plant, including when this record describes one generator.
Location: Plant location · not an individual generator location
Sources, reference dates and retrieval dates 2items
Data Source 2025 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
Source location 3_1_Generator_Y2025.xlsx#Operable:10384
Sources EV-980388df423b2ca7f4134849Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 96fc9bf552b66b807e7dac6021fbf9db18d0972a599b1dbcc5b675fe0e0a8664
Usage terms US government public domain
Data Source 2026-08 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
Source location Operating:10387
Sources EV-b5c4e35f6bebfb54ba6a1b56Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 c9eee153036bf1aa7f3351441d69ec45a4cd8b9c4ea72f917214fb0c054cae1d
Usage terms US government public domain
