United States of America · Generator · plant location

Colebrook Hydroelectric / BK1

공식 원천의 전력 객체 · Retired

Project stage · source basis
Suspended / closed · retired
Reported operator
Metropolitan Dist of Hartford
Address
Check each original source
Data Reference Date
2025
Collection review date
2026-10-05
Location meaning
Plant location · not an individual generator location · Accuracy not disclosed
Coordinates and geometry
42.007778, -73.0356

These are source records. Operator labels do not confirm legal ownership or operations. Map locations do not verify supplying substations, power contracts or current available capacity.

Power assets and projects · USA · eia860m

Colebrook Hydroelectric / BK1

Generator · Retired

Metric or conditionSource valueBasis, scope and stage
Nameplate Capacity (MW)1.5 MWOriginal source column definition · Generator · Retired
As-of date 2026-08
Sources EV-01b4f6982cae0061f1197eb1
Net Summer Capacity (MW)1.4 MWOriginal source column definition · Generator · Retired
As-of date 2026-08
Sources EV-01b4f6982cae0061f1197eb1
Net Winter Capacity (MW)1.4 MWOriginal source column definition · Generator · Retired
As-of date 2026-08
Sources EV-01b4f6982cae0061f1197eb1
Detailed source fields
Original source fieldPublished value or condition
Entity ID12382
Entity NameMetropolitan Dist of Hartford
Plant ID54301
Plant NameColebrook Hydroelectric
Google MapMap
Bing MapMap
Plant StateCT
CountyLitchfield
Balancing Authority CodeISNE
SectorIPP Non-CHP
Generator IDBK1
Nameplate Capacity (MW)1.5
Net Summer Capacity (MW)1.4
Net Winter Capacity (MW)1.4
TechnologyConventional Hydroelectric
Energy Source CodeWAT
Prime Mover CodeHY
Operating Month4
Operating Year1988
Retirement Month5
Retirement Year2019
Latitude42.007778
Longitude-73.0356
Original textRetired
Coordinate accuracysource_precision_not_independently_surveyed
source_record_idRetired:2185

Parent facility or plant record

Coordinates locate the plant, including when this record describes one generator.

Location: Plant location · not an individual generator location

Sources, reference dates and retrieval dates 2items
eia860 ↗

Data Source 2025 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location 3_1_Generator_Y2025.xlsx#Retired and Canceled:3864

Sources EV-f9c955d7707ec76430c3bb0d
Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 4d9b2b79dc4b6192019f364c26d6ea15f1ed1f0ca7eea839304706a31165e477

Usage terms US government public domain

eia860m ↗

Data Source 2026-08 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location Retired:2185

Sources EV-01b4f6982cae0061f1197eb1
Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 15fe68eed09b77c77981cf89f4f47bdb631063f227c6dfa523a20cd89cbab00c

Usage terms US government public domain

Related power and facility evidence

Loading related evidence…

Other records with the same country and operator label

These source records have not been merged as a confirmed legal entity or campus.

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel