J K Smith / GT12
Generator · Cancelled or postponed
| Metric or condition | Source value | Basis, scope and stage |
|---|---|---|
| Nameplate Capacity (MW) | 98 MW | Original source column definition · Generator · Canceled or Postponed As-of date 2026-08 Sources EV-ceb0c715e741bbef4696775c |
| Net Summer Capacity (MW) | 74 MW | Original source column definition · Generator · Canceled or Postponed As-of date 2026-08 Sources EV-ceb0c715e741bbef4696775c |
| Net Winter Capacity (MW) | 98 MW | Original source column definition · Generator · Canceled or Postponed As-of date 2026-08 Sources EV-ceb0c715e741bbef4696775c |
Detailed source fields
| Original source field | Published value or condition |
|---|---|
| Entity ID | 5580 |
| Entity Name | East Kentucky Power Coop, Inc |
| Plant ID | 54 |
| Plant Name | J K Smith |
| Google Map | Map |
| Bing Map | Map |
| Plant State | KY |
| County | Clark |
| Balancing Authority Code | PJM |
| Sector | Electric Utility |
| Generator ID | GT12 |
| Nameplate Capacity (MW) | 98 |
| Net Summer Capacity (MW) | 74 |
| Net Winter Capacity (MW) | 98 |
| Technology | Natural Gas Fired Combustion Turbine |
| Energy Source Code | NG |
| Prime Mover Code | GT |
| Latitude | 37.8833 |
| Longitude | -84.1017 |
| Original text | Canceled or Postponed |
| Coordinate accuracy | source_precision_not_independently_surveyed |
| source_record_id | Canceled or Postponed:5 |
Parent facility or plant record
Coordinates locate the plant, including when this record describes one generator.
Location: Plant location · not an individual generator location
Sources, reference dates and retrieval dates 2items
Data Source 2025 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
Source location 3_1_Generator_Y2025.xlsx#Retired and Canceled:27
Sources EV-9b77bc734fadb75fb89ad8e5Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 8f6f86c12882e3e817c6e1a17abb414860ba2be84e03da4abd159f73a70429cb
Usage terms US government public domain
Data Source 2026-08 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
Source location Canceled or Postponed:5
Sources EV-ceb0c715e741bbef4696775cEvidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 360e282fd85207d155e3920b056468a592e95be58ca5679b812d7f4e6cbfb0e4
Usage terms US government public domain
