J K Smith / GT11
Generator · Cancelled or postponed
| Metric or condition | Source value | Basis, scope and stage |
|---|---|---|
| Nameplate Capacity (MW) | 98 MW | Original source column definition · Generator · Canceled or Postponed As-of date 2026-08 Sources EV-09a06e7f2c4a1aed24982bb0 |
| Net Summer Capacity (MW) | 74 MW | Original source column definition · Generator · Canceled or Postponed As-of date 2026-08 Sources EV-09a06e7f2c4a1aed24982bb0 |
| Net Winter Capacity (MW) | 98 MW | Original source column definition · Generator · Canceled or Postponed As-of date 2026-08 Sources EV-09a06e7f2c4a1aed24982bb0 |
Detailed source fields
| Original source field | Published value or condition |
|---|---|
| Entity ID | 5580 |
| Entity Name | East Kentucky Power Coop, Inc |
| Plant ID | 54 |
| Plant Name | J K Smith |
| Google Map | Map |
| Bing Map | Map |
| Plant State | KY |
| County | Clark |
| Balancing Authority Code | PJM |
| Sector | Electric Utility |
| Generator ID | GT11 |
| Nameplate Capacity (MW) | 98 |
| Net Summer Capacity (MW) | 74 |
| Net Winter Capacity (MW) | 98 |
| Technology | Natural Gas Fired Combustion Turbine |
| Energy Source Code | NG |
| Prime Mover Code | GT |
| Latitude | 37.8833 |
| Longitude | -84.1017 |
| Original text | Canceled or Postponed |
| Coordinate accuracy | source_precision_not_independently_surveyed |
| source_record_id | Canceled or Postponed:4 |
Parent facility or plant record
Coordinates locate the plant, including when this record describes one generator.
Location: Plant location · not an individual generator location
Sources, reference dates and retrieval dates 2items
Data Source 2025 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
Source location 3_1_Generator_Y2025.xlsx#Retired and Canceled:26
Sources EV-56e7b2af23bc6077a2659e8aEvidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 560d6167a913df8745a57a087cce1b6b569dea353befc6f31aad3fa5244fe905
Usage terms US government public domain
Data Source 2026-08 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
Source location Canceled or Postponed:4
Sources EV-09a06e7f2c4a1aed24982bb0Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 27680d05900db4218bd8360cee1ca011e946466d9442022f353ed7e020ae8c12
Usage terms US government public domain
