Steamboat Hills LP / SBSL2
Generator · Operations
| Metric or condition | Source value | Basis, scope and stage |
|---|---|---|
| Nameplate Capacity (MW) | 3.6 MW | Original source column definition · Generator · (OP) Operating As-of date 2026-08 Sources EV-8f70c23ca7f84970c78dce0e |
| Net Summer Capacity (MW) | 3.6 MW | Original source column definition · Generator · (OP) Operating As-of date 2026-08 Sources EV-8f70c23ca7f84970c78dce0e |
| Net Winter Capacity (MW) | 1.8 MW | Original source column definition · Generator · (OP) Operating As-of date 2026-08 Sources EV-8f70c23ca7f84970c78dce0e |
| DC Net Capacity (MW) | 4.5 MWdc | Original source column definition · Generator · (OP) Operating As-of date 2026-08 Sources EV-8f70c23ca7f84970c78dce0e |
Detailed source fields
| Original source field | Published value or condition |
|---|---|
| Entity ID | 34691 |
| Entity Name | Ormat Nevada Inc |
| Plant ID | 50654 |
| Plant Name | Steamboat Hills LP |
| Google Map | Map |
| Bing Map | Map |
| Plant State | NV |
| County | Washoe |
| Balancing Authority Code | NEVP |
| Sector | IPP Non-CHP |
| Generator ID | SBSL2 |
| Nameplate Capacity (MW) | 3.6 |
| Net Summer Capacity (MW) | 3.6 |
| Net Winter Capacity (MW) | 1.8 |
| Technology | Solar Photovoltaic |
| Energy Source Code | SUN |
| Prime Mover Code | PV |
| Operating Month | 3 |
| Operating Year | 2024 |
| Status | (OP) Operating |
| DC Net Capacity (MW) | 4.5 |
| Latitude | 39.37 |
| Longitude | -119.7669 |
| Original text | (OP) Operating |
| Coordinate accuracy | source_precision_not_independently_surveyed |
| source_record_id | Operating:9710 |
Parent facility or plant record
Coordinates locate the plant, including when this record describes one generator.
Location: Plant location · not an individual generator location
Sources, reference dates and retrieval dates 2items
Data Source 2025 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
Source location 3_1_Generator_Y2025.xlsx#Operable:9706
Sources EV-94eeb5d9d18ebbccc9008b0cEvidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 6132fc2a0eeee713284f2214ddf09d26229bf74bc83cfd167904d9600eaf4acc
Usage terms US government public domain
Data Source 2026-08 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
Source location Operating:9710
Sources EV-8f70c23ca7f84970c78dce0eEvidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 da7e263694f4dc8b5a9fad4e5d3a9155a626f7a00e16da0a407e6813683f8c33
Usage terms US government public domain
