United States of America · Generator · plant location

TXU Sweetwater Generating Plant / GT02

공식 원천의 전력 객체 · Retired

Project stage · source basis
Suspended / closed · retired
Reported operator
Luminant Generation Company LLC
Address
Check each original source
Data Reference Date
2026-08
Collection review date
2026-10-05
Location meaning
Plant location · not an individual generator location · Accuracy not disclosed
Coordinates and geometry
32.492831, -100.365

These are source records. Operator labels do not confirm legal ownership or operations. Map locations do not verify supplying substations, power contracts or current available capacity.

Power assets and projects · USA · eia860m

TXU Sweetwater Generating Plant / GT02

Generator · Retired

Metric or conditionSource valueBasis, scope and stage
Nameplate Capacity (MW)99 MWOriginal source column definition · Generator · Retired
As-of date 2026-08
Sources EV-f988dc2850dbac8bed4e4ba4
Net Summer Capacity (MW)86 MWOriginal source column definition · Generator · Retired
As-of date 2026-08
Sources EV-f988dc2850dbac8bed4e4ba4
Net Winter Capacity (MW)86 MWOriginal source column definition · Generator · Retired
As-of date 2026-08
Sources EV-f988dc2850dbac8bed4e4ba4
Detailed source fields
Original source fieldPublished value or condition
Entity ID55983
Entity NameLuminant Generation Company LLC
Plant ID50615
Plant NameTXU Sweetwater Generating Plant
Google MapMap
Bing MapMap
Plant StateTX
CountyNolan
Balancing Authority CodeERCO
SectorIPP CHP
Generator IDGT02
Nameplate Capacity (MW)99
Net Summer Capacity (MW)86
Net Winter Capacity (MW)86
TechnologyNatural Gas Fired Combined Cycle
Energy Source CodeNG
Prime Mover CodeCT
Operating Month6
Operating Year1989
Retirement Month5
Retirement Year2012
Latitude32.492831
Longitude-100.365
Original textRetired
Coordinate accuracysource_precision_not_independently_surveyed
source_record_idRetired:4668

Parent facility or plant record

Coordinates locate the plant, including when this record describes one generator.

Location: Plant location · not an individual generator location

Sources, reference dates and retrieval dates 2items
eia860 ↗

Data Source 2025 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location 3_1_Generator_Y2025.xlsx#Retired and Canceled:3559

Sources EV-aace67fe5a07fca8c6d8127a
Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 232f771c5695e99b286fa747881d24e2922bd80df15120ef09165543eb706f87

Usage terms US government public domain

eia860m ↗

Data Source 2026-08 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location Retired:4668

Sources EV-f988dc2850dbac8bed4e4ba4
Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 1245b745bc18f7e21a2bccc51c2916c9559741d46dc59e6feada1f9ae81815e8

Usage terms US government public domain

Related power and facility evidence

Loading related evidence…

Other records with the same country and operator label

These source records have not been merged as a confirmed legal entity or campus.

Find related records →

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel