United States of America · Generator · plant location

Don Pedro / 2

공식 원천의 전력 객체 · Operations

Project stage · source basis
Operation announced · operating
Reported operator
Turlock Irrigation District
Address
Check each original source
Data Reference Date
2026-08
Collection review date
2026-10-05
Location meaning
Plant location · not an individual generator location · Accuracy not disclosed
Coordinates and geometry
37.695994, -120.4202

These are source records. Operator labels do not confirm legal ownership or operations. Map locations do not verify supplying substations, power contracts or current available capacity.

Power assets and projects · USA · eia860m

Don Pedro / 2

Generator · Operations

Metric or conditionSource valueBasis, scope and stage
Nameplate Capacity (MW)45.5 MWOriginal source column definition · Generator · (OP) Operating
As-of date 2026-08
Sources EV-ae4904f11f6d9dad00b0a5b5
Net Summer Capacity (MW)55 MWOriginal source column definition · Generator · (OP) Operating
As-of date 2026-08
Sources EV-ae4904f11f6d9dad00b0a5b5
Net Winter Capacity (MW)55 MWOriginal source column definition · Generator · (OP) Operating
As-of date 2026-08
Sources EV-ae4904f11f6d9dad00b0a5b5
Planned Uprate of Summer Capacity (MW)20 MWOriginal source column definition · Generator · (OP) Operating
As-of date 2026-08
Sources EV-ae4904f11f6d9dad00b0a5b5
Detailed source fields
Original source fieldPublished value or condition
Entity ID19281
Entity NameTurlock Irrigation District
Plant ID439
Plant NameDon Pedro
Google MapMap
Bing MapMap
Plant StateCA
CountyTuolumne
Balancing Authority CodeTIDC
SectorElectric Utility
Generator ID2
Nameplate Capacity (MW)45.5
Net Summer Capacity (MW)55
Net Winter Capacity (MW)55
TechnologyConventional Hydroelectric
Energy Source CodeWAT
Prime Mover CodeHY
Operating Month5
Operating Year1971
Status(OP) Operating
Planned Uprate Year2027
Planned Uprate Month10
Planned Uprate of Summer Capacity (MW)20
Latitude37.695994
Longitude-120.4202
Original text(OP) Operating
Coordinate accuracysource_precision_not_independently_surveyed
source_record_idOperating:763

Parent facility or plant record

Coordinates locate the plant, including when this record describes one generator.

Location: Plant location · not an individual generator location

Sources, reference dates and retrieval dates 2items
eia860 ↗

Data Source 2025 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location 3_1_Generator_Y2025.xlsx#Operable:757

Sources EV-f45a3213ca4ec98f0b0dffd1
Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 726283b5331d6d188cdc7d3ba2fe9c50e6e9a3a672eab87db3cef07bfaea5da5

Usage terms US government public domain

eia860m ↗

Data Source 2026-08 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location Operating:763

Sources EV-ae4904f11f6d9dad00b0a5b5
Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 ba17679ae43506a2d9bfd2ecfcec96de9d9cae32d754d410f2c20c1c83798994

Usage terms US government public domain

Related power and facility evidence

Loading related evidence…

Other records with the same country and operator label

These source records have not been merged as a confirmed legal entity or campus.

Find related records →

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel