United States of America · Generator · plant location

Merrill / 2

공식 원천의 전력 객체 · Operations

Project stage · source basis
Operation announced · operating
Reported operator
Wisconsin Public Service Corp
Address
Check each original source
Data Reference Date
2026-08
Collection review date
2026-10-05
Location meaning
Plant location · not an individual generator location · Accuracy not disclosed
Coordinates and geometry
45.1786, -89.685

These are source records. Operator labels do not confirm legal ownership or operations. Map locations do not verify supplying substations, power contracts or current available capacity.

Power assets and projects · USA · eia860m

Merrill / 2

Generator · Operations

Metric or conditionSource valueBasis, scope and stage
Nameplate Capacity (MW)0.4 MWOriginal source column definition · Generator · (OP) Operating
As-of date 2026-08
Sources EV-6b5cb5c10f429d51a45b8e15
Net Summer Capacity (MW)0.4 MWOriginal source column definition · Generator · (OP) Operating
As-of date 2026-08
Sources EV-6b5cb5c10f429d51a45b8e15
Net Winter Capacity (MW)0.4 MWOriginal source column definition · Generator · (OP) Operating
As-of date 2026-08
Sources EV-6b5cb5c10f429d51a45b8e15
Detailed source fields
Original source fieldPublished value or condition
Entity ID20860
Entity NameWisconsin Public Service Corp
Plant ID4068
Plant NameMerrill
Google MapMap
Bing MapMap
Plant StateWI
CountyLincoln
Balancing Authority CodeMISO
SectorElectric Utility
Generator ID2
Nameplate Capacity (MW)0.4
Net Summer Capacity (MW)0.4
Net Winter Capacity (MW)0.4
TechnologyConventional Hydroelectric
Energy Source CodeWAT
Prime Mover CodeHY
Operating Month3
Operating Year1917
Status(OP) Operating
Latitude45.1786
Longitude-89.685
Original text(OP) Operating
Coordinate accuracysource_precision_not_independently_surveyed
source_record_idOperating:5693

Parent facility or plant record

Coordinates locate the plant, including when this record describes one generator.

Location: Plant location · not an individual generator location

Sources, reference dates and retrieval dates 2items
eia860 ↗

Data Source 2025 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location 3_1_Generator_Y2025.xlsx#Operable:5687

Sources EV-66eacef0562e8f4ca33ecad1
Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 b707b899c80c6e8c0614e1a4a5582088b4f68f45ba3398693c6735198277bec9

Usage terms US government public domain

eia860m ↗

Data Source 2026-08 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location Operating:5693

Sources EV-6b5cb5c10f429d51a45b8e15
Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 261fa4240e122831006f857d01413e656fcb356b8575883a89be5ca694db372b

Usage terms US government public domain

Related power and facility evidence

Loading related evidence…

Other records with the same country and operator label

These source records have not been merged as a confirmed legal entity or campus.

Find related records →

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel