South Oak Creek / 15
Generator · Plan
| Metric or condition | Source value | Basis, scope and stage |
|---|---|---|
| Nameplate Capacity (MW) | 236.3 MW | Original source column definition · Generator · (L) Regulatory approvals pending. Not under construction As-of date 2026-08 Sources EV-8212650e88ff6f6f867386ba |
| Net Summer Capacity (MW) | 227.6 MW | Original source column definition · Generator · (L) Regulatory approvals pending. Not under construction As-of date 2026-08 Sources EV-8212650e88ff6f6f867386ba |
| Net Winter Capacity (MW) | 227.6 MW | Original source column definition · Generator · (L) Regulatory approvals pending. Not under construction As-of date 2026-08 Sources EV-8212650e88ff6f6f867386ba |
Detailed source fields
| Original source field | Published value or condition |
|---|---|
| Entity ID | 20847 |
| Entity Name | Wisconsin Electric Power Co |
| Plant ID | 4041 |
| Plant Name | South Oak Creek |
| Google Map | Map |
| Bing Map | Map |
| Plant State | WI |
| County | Milwaukee |
| Balancing Authority Code | MISO |
| Sector | Electric Utility |
| Generator ID | 15 |
| Nameplate Capacity (MW) | 236.3 |
| Net Summer Capacity (MW) | 227.6 |
| Net Winter Capacity (MW) | 227.6 |
| Technology | Natural Gas Fired Combustion Turbine |
| Energy Source Code | NG |
| Prime Mover Code | GT |
| Planned Operation Month | 2 |
| Planned Operation Year | 2028 |
| Status | (L) Regulatory approvals pending. Not under construction |
| Latitude | 42.8457 |
| Longitude | -87.8294 |
| Original text | (L) Regulatory approvals pending. Not under construction |
| Coordinate accuracy | source_precision_not_independently_surveyed |
| source_record_id | Planned:1438 |
Parent facility or plant record
Coordinates locate the plant, including when this record describes one generator.
Location: Plant location · not an individual generator location
Sources, reference dates and retrieval dates 2items
Data Source 2025 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
Source location 3_1_Generator_Y2025.xlsx#Proposed:102
Sources EV-99286c8cefbc819d28c4e090Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 3f27fbe098e13972d8fdacb77d00034d996536d20ec02708bfa0eb3fe0b43a1f
Usage terms US government public domain
Data Source 2026-08 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
Source location Planned:1438
Sources EV-8212650e88ff6f6f867386baEvidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 48bfc47a04e6d20e0bc0ca47e5e96b2c37ae584c8ef2de731bafc7278ffb93dd
Usage terms US government public domain
