Port Washington Generating Station / 2CT2
Generator · Operations
| Metric or condition | Source value | Basis, scope and stage |
|---|---|---|
| Nameplate Capacity (MW) | 173.1 MW | Original source column definition · Generator · (OP) Operating As-of date 2026-08 Sources EV-efd49de3d03352b2f7f3d695 |
| Net Summer Capacity (MW) | 174.9 MW | Original source column definition · Generator · (OP) Operating As-of date 2026-08 Sources EV-efd49de3d03352b2f7f3d695 |
| Net Winter Capacity (MW) | 204.5 MW | Original source column definition · Generator · (OP) Operating As-of date 2026-08 Sources EV-efd49de3d03352b2f7f3d695 |
| Planned Uprate of Summer Capacity (MW) | 25 MW | Original source column definition · Generator · (OP) Operating As-of date 2026-08 Sources EV-efd49de3d03352b2f7f3d695 |
Detailed source fields
| Original source field | Published value or condition |
|---|---|
| Entity ID | 20847 |
| Entity Name | Wisconsin Electric Power Co |
| Plant ID | 4040 |
| Plant Name | Port Washington Generating Station |
| Google Map | Map |
| Bing Map | Map |
| Plant State | WI |
| County | Ozaukee |
| Balancing Authority Code | MISO |
| Sector | Electric Utility |
| Generator ID | 2CT2 |
| Unit Code | PWG2 |
| Nameplate Capacity (MW) | 173.1 |
| Net Summer Capacity (MW) | 174.9 |
| Net Winter Capacity (MW) | 204.5 |
| Technology | Natural Gas Fired Combined Cycle |
| Energy Source Code | NG |
| Prime Mover Code | CT |
| Operating Month | 7 |
| Operating Year | 2005 |
| Status | (OP) Operating |
| Planned Uprate Year | 2028 |
| Planned Uprate Month | 5 |
| Planned Uprate of Summer Capacity (MW) | 25 |
| Latitude | 43.3842 |
| Longitude | -87.8689 |
| Original text | (OP) Operating |
| Coordinate accuracy | source_precision_not_independently_surveyed |
| source_record_id | Operating:5643 |
Parent facility or plant record
Coordinates locate the plant, including when this record describes one generator.
Location: Plant location · not an individual generator location
Sources, reference dates and retrieval dates 2items
Data Source 2025 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
Source location 3_1_Generator_Y2025.xlsx#Operable:5637
Sources EV-26232d58e3e169d0189e2a83Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 918609a0e76d3f0e79b566c183c7a85271405106f87c8c6a2c258dc4e4ebf492
Usage terms US government public domain
Data Source 2026-08 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
Source location Operating:5643
Sources EV-efd49de3d03352b2f7f3d695Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c