United States of America · Generator · plant location

Yorktown / 1

공식 원천의 전력 객체 · Retired

Project stage · source basis
Suspended / closed · retired
Reported operator
Virginia Electric & Power Co
Address
Check each original source
Data Reference Date
2026-08
Collection review date
2026-10-05
Location meaning
Plant location · not an individual generator location · Accuracy not disclosed
Coordinates and geometry
37.2144, -76.4611

These are source records. Operator labels do not confirm legal ownership or operations. Map locations do not verify supplying substations, power contracts or current available capacity.

Power assets and projects · USA · eia860m

Yorktown / 1

Generator · Retired

Metric or conditionSource valueBasis, scope and stage
Nameplate Capacity (MW)187.5 MWOriginal source column definition · Generator · Retired
As-of date 2026-08
Sources EV-07ddd4169366a1708d293a40
Net Summer Capacity (MW)159 MWOriginal source column definition · Generator · Retired
As-of date 2026-08
Sources EV-07ddd4169366a1708d293a40
Net Winter Capacity (MW)162 MWOriginal source column definition · Generator · Retired
As-of date 2026-08
Sources EV-07ddd4169366a1708d293a40
Detailed source fields
Original source fieldPublished value or condition
Entity ID19876
Entity NameVirginia Electric & Power Co
Plant ID3809
Plant NameYorktown
Google MapMap
Bing MapMap
Plant StateVA
CountyYork
Balancing Authority CodePJM
SectorElectric Utility
Generator ID1
Nameplate Capacity (MW)187.5
Net Summer Capacity (MW)159
Net Winter Capacity (MW)162
TechnologyConventional Steam Coal
Energy Source CodeBIT
Prime Mover CodeST
Operating Month7
Operating Year1957
Retirement Month3
Retirement Year2019
Latitude37.2144
Longitude-76.4611
Original textRetired
Coordinate accuracysource_precision_not_independently_surveyed
source_record_idRetired:2240

Parent facility or plant record

Coordinates locate the plant, including when this record describes one generator.

Location: Plant location · not an individual generator location

Sources, reference dates and retrieval dates 2items
eia860 ↗

Data Source 2025 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location 3_1_Generator_Y2025.xlsx#Retired and Canceled:2296

Sources EV-ec66ab5f5ded477c6129e799
Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 c4e167f17b81c491061e4159b8236eeba953f62670efa83c17e25226cc8fbf77

Usage terms US government public domain

eia860m ↗

Data Source 2026-08 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location Retired:2240

Sources EV-07ddd4169366a1708d293a40
Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 aa65866490d5e5a10dcfb225306ac82698c06ae2dbcec1427450160677a5894b

Usage terms US government public domain

Related power and facility evidence

Loading related evidence…

Other records with the same country and operator label

These source records have not been merged as a confirmed legal entity or campus.

Find related records →

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel