United States of America · Generator · plant location

Possum Point / 5

공식 원천의 전력 객체 · Retired

Project stage · source basis
Suspended / closed · retired
Reported operator
Virginia Electric & Power Co
Address
Check each original source
Data Reference Date
2026-08
Collection review date
2026-10-05
Location meaning
Plant location · not an individual generator location · Accuracy not disclosed
Coordinates and geometry
38.5367, -77.2806

These are source records. Operator labels do not confirm legal ownership or operations. Map locations do not verify supplying substations, power contracts or current available capacity.

Power assets and projects · USA · eia860m

Possum Point / 5

Generator · Retired

Metric or conditionSource valueBasis, scope and stage
Nameplate Capacity (MW)882 MWOriginal source column definition · Generator · Retired
As-of date 2026-08
Sources EV-78c7ab5c98322d2a8744f06c
Net Summer Capacity (MW)786 MWOriginal source column definition · Generator · Retired
As-of date 2026-08
Sources EV-78c7ab5c98322d2a8744f06c
Net Winter Capacity (MW)805 MWOriginal source column definition · Generator · Retired
As-of date 2026-08
Sources EV-78c7ab5c98322d2a8744f06c
Detailed source fields
Original source fieldPublished value or condition
Entity ID19876
Entity NameVirginia Electric & Power Co
Plant ID3804
Plant NamePossum Point
Google MapMap
Bing MapMap
Plant StateVA
CountyPrince William
Balancing Authority CodePJM
SectorElectric Utility
Generator ID5
Nameplate Capacity (MW)882
Net Summer Capacity (MW)786
Net Winter Capacity (MW)805
TechnologyPetroleum Liquids
Energy Source CodeRFO
Prime Mover CodeST
Operating Month6
Operating Year1975
Retirement Month12
Retirement Year2020
Latitude38.5367
Longitude-77.2806
Original textRetired
Coordinate accuracysource_precision_not_independently_surveyed
source_record_idRetired:1638

Parent facility or plant record

Coordinates locate the plant, including when this record describes one generator.

Location: Plant location · not an individual generator location

Sources, reference dates and retrieval dates 2items
eia860 ↗

Data Source 2025 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location 3_1_Generator_Y2025.xlsx#Retired and Canceled:2295

Sources EV-f514721c06b32a6e261dabf1
Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 126cc22d8baee00ef38b5bdd2acfe07dae23261bc504f4fcf91a42d0fa04a6e9

Usage terms US government public domain

eia860m ↗

Data Source 2026-08 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location Retired:1638

Sources EV-78c7ab5c98322d2a8744f06c
Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 0fbe226cd768c0d5e5ffd44d9c6d14186866883322f440ab7fdc61845f7de482

Usage terms US government public domain

Related power and facility evidence

Loading related evidence…

Other records with the same country and operator label

These source records have not been merged as a confirmed legal entity or campus.

Find related records →

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel