United States of America · Generator · plant location

Chesterfield / 3

공식 원천의 전력 객체 · Retired

Project stage · source basis
Suspended / closed · retired
Reported operator
Virginia Electric & Power Co
Address
Check each original source
Data Reference Date
2026-08
Collection review date
2026-10-05
Location meaning
Plant location · not an individual generator location · Accuracy not disclosed
Coordinates and geometry
37.3822, -77.3833

These are source records. Operator labels do not confirm legal ownership or operations. Map locations do not verify supplying substations, power contracts or current available capacity.

Power assets and projects · USA · eia860m

Chesterfield / 3

Generator · Retired

Metric or conditionSource valueBasis, scope and stage
Nameplate Capacity (MW)112.5 MWOriginal source column definition · Generator · Retired
As-of date 2026-08
Sources EV-84c0725f9fbe53c91f74ab64
Net Summer Capacity (MW)97.5 MWOriginal source column definition · Generator · Retired
As-of date 2026-08
Sources EV-84c0725f9fbe53c91f74ab64
Net Winter Capacity (MW)101.5 MWOriginal source column definition · Generator · Retired
As-of date 2026-08
Sources EV-84c0725f9fbe53c91f74ab64
Detailed source fields
Original source fieldPublished value or condition
Entity ID19876
Entity NameVirginia Electric & Power Co
Plant ID3797
Plant NameChesterfield
Google MapMap
Bing MapMap
Plant StateVA
CountyChesterfield
Balancing Authority CodePJM
SectorElectric Utility
Generator ID3
Nameplate Capacity (MW)112.5
Net Summer Capacity (MW)97.5
Net Winter Capacity (MW)101.5
TechnologyConventional Steam Coal
Energy Source CodeBIT
Prime Mover CodeST
Operating Month12
Operating Year1952
Retirement Month3
Retirement Year2019
Latitude37.3822
Longitude-77.3833
Original textRetired
Coordinate accuracysource_precision_not_independently_surveyed
source_record_idRetired:2236

Parent facility or plant record

Coordinates locate the plant, including when this record describes one generator.

Location: Plant location · not an individual generator location

Sources, reference dates and retrieval dates 2items
eia860 ↗

Data Source 2025 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location 3_1_Generator_Y2025.xlsx#Retired and Canceled:2278

Sources EV-0fdb285d06f057c916589712
Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 753431adef60e36880d04bb6c95501fe652504b98e4a65177947470ef4eaa4c4

Usage terms US government public domain

eia860m ↗

Data Source 2026-08 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location Retired:2236

Sources EV-84c0725f9fbe53c91f74ab64
Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 92fec138a86a8165c0894e55418a12d5660a1a4315ef62e99e672d0653c8ae14

Usage terms US government public domain

Related power and facility evidence

Loading related evidence…

Other records with the same country and operator label

These source records have not been merged as a confirmed legal entity or campus.

Find related records →

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel