United States of America · Generator · plant location

Buck Hydro / 2

공식 원천의 전력 객체 · Operations

Project stage · source basis
Operation announced · operating
Reported operator
Appalachian Power Co
Address
Check each original source
Data Reference Date
2026-08
Collection review date
2026-10-05
Location meaning
Plant location · not an individual generator location · Accuracy not disclosed
Coordinates and geometry
36.808229, -80.93871

These are source records. Operator labels do not confirm legal ownership or operations. Map locations do not verify supplying substations, power contracts or current available capacity.

Power assets and projects · USA · eia860m

Buck Hydro / 2

Generator · Operations

Metric or conditionSource valueBasis, scope and stage
Nameplate Capacity (MW)2.8 MWOriginal source column definition · Generator · (OP) Operating
As-of date 2026-08
Sources EV-bf2cfa22dfd5f8ea3ed1ef25
Net Summer Capacity (MW)3 MWOriginal source column definition · Generator · (OP) Operating
As-of date 2026-08
Sources EV-bf2cfa22dfd5f8ea3ed1ef25
Net Winter Capacity (MW)5.3 MWOriginal source column definition · Generator · (OP) Operating
As-of date 2026-08
Sources EV-bf2cfa22dfd5f8ea3ed1ef25
Detailed source fields
Original source fieldPublished value or condition
Entity ID733
Entity NameAppalachian Power Co
Plant ID3772
Plant NameBuck Hydro
Google MapMap
Bing MapMap
Plant StateVA
CountyCarroll
Balancing Authority CodePJM
SectorElectric Utility
Generator ID2
Nameplate Capacity (MW)2.8
Net Summer Capacity (MW)3
Net Winter Capacity (MW)5.3
TechnologyConventional Hydroelectric
Energy Source CodeWAT
Prime Mover CodeHY
Operating Month1
Operating Year1912
Status(OP) Operating
Latitude36.808229
Longitude-80.93871
Original text(OP) Operating
Coordinate accuracysource_precision_not_independently_surveyed
source_record_idOperating:5226

Parent facility or plant record

Coordinates locate the plant, including when this record describes one generator.

Location: Plant location · not an individual generator location

Sources, reference dates and retrieval dates 2items
eia860 ↗

Data Source 2025 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location 3_1_Generator_Y2025.xlsx#Operable:5221

Sources EV-89dc2c5905b04d5739b09d03
Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 4b31f9511be8afe61b7c329fdeb936b20a2d1c5d0cef215a28b6be8dd7f3b0b1

Usage terms US government public domain

eia860m ↗

Data Source 2026-08 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location Operating:5226

Sources EV-bf2cfa22dfd5f8ea3ed1ef25
Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 feeb2e58c598cae701fb38a77f44dc6d764c8f2d2435e3252ebc2814ee135990

Usage terms US government public domain

Related power and facility evidence

Loading related evidence…

Other records with the same country and operator label

These source records have not been merged as a confirmed legal entity or campus.

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel