United States of America · Generator · plant location

Tradinghouse / CT1

공식 원천의 전력 객체 · Cancelled or postponed

Project stage · source basis
Stage requires verification · cancelled_or_postponed
Reported operator
Luminant Generation Company LLC
Address
Check each original source
Data Reference Date
2026-08
Collection review date
2026-10-05
Location meaning
Plant location · not an individual generator location · Accuracy not disclosed
Coordinates and geometry
31.5728, -96.9642

These are source records. Operator labels do not confirm legal ownership or operations. Map locations do not verify supplying substations, power contracts or current available capacity.

Power assets and projects · USA · eia860m

Tradinghouse / CT1

Generator · Cancelled or postponed

Metric or conditionSource valueBasis, scope and stage
Nameplate Capacity (MW)235.5 MWOriginal source column definition · Generator · Canceled or Postponed
As-of date 2026-08
Sources EV-e00c59c0cc6df7a6c34ad933
Net Summer Capacity (MW)207 MWOriginal source column definition · Generator · Canceled or Postponed
As-of date 2026-08
Sources EV-e00c59c0cc6df7a6c34ad933
Net Winter Capacity (MW)230 MWOriginal source column definition · Generator · Canceled or Postponed
As-of date 2026-08
Sources EV-e00c59c0cc6df7a6c34ad933
Detailed source fields
Original source fieldPublished value or condition
Entity ID55983
Entity NameLuminant Generation Company LLC
Plant ID3506
Plant NameTradinghouse
Google MapMap
Bing MapMap
Plant StateTX
CountyMcLennan
Balancing Authority CodeERCO
SectorIPP Non-CHP
Generator IDCT1
Nameplate Capacity (MW)235.5
Net Summer Capacity (MW)207
Net Winter Capacity (MW)230
TechnologyNatural Gas Fired Combustion Turbine
Energy Source CodeNG
Prime Mover CodeGT
Latitude31.5728
Longitude-96.9642
Original textCanceled or Postponed
Coordinate accuracysource_precision_not_independently_surveyed
source_record_idCanceled or Postponed:55

Parent facility or plant record

Coordinates locate the plant, including when this record describes one generator.

Location: Plant location · not an individual generator location

Sources, reference dates and retrieval dates 2items
eia860 ↗

Data Source 2025 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location 3_1_Generator_Y2025.xlsx#Retired and Canceled:2203

Sources EV-27df5fcd7f66e505501af364
Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 e30047438257f236b3a00f814aeb68c7b28d0db80bff6a911531f22f6a4cc8a8

Usage terms US government public domain

eia860m ↗

Data Source 2026-08 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location Canceled or Postponed:55

Sources EV-e00c59c0cc6df7a6c34ad933
Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 40bd684194f845ae0a9148674d3dfb6b8b41b1cf9359da4c8d94f8932c06a4cc

Usage terms US government public domain

Related power and facility evidence

Loading related evidence…

Other records with the same country and operator label

These source records have not been merged as a confirmed legal entity or campus.

Find related records →

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel