United States of America · Generator · plant location

Big Brown / 3

공식 원천의 전력 객체 · Cancelled or postponed

Project stage · source basis
Stage requires verification · cancelled_or_postponed
Reported operator
Luminant Generation Company LLC
Address
Check each original source
Data Reference Date
2026-08
Collection review date
2026-10-05
Location meaning
Plant location · not an individual generator location · Accuracy not disclosed
Coordinates and geometry
31.8206, -96.0544

These are source records. Operator labels do not confirm legal ownership or operations. Map locations do not verify supplying substations, power contracts or current available capacity.

Power assets and projects · USA · eia860m

Big Brown / 3

Generator · Cancelled or postponed

Metric or conditionSource valueBasis, scope and stage
Nameplate Capacity (MW)800 MWOriginal source column definition · Generator · Canceled or Postponed
As-of date 2026-08
Sources EV-19fc47baddb21d3cc534965b
Net Summer Capacity (MW)800 MWOriginal source column definition · Generator · Canceled or Postponed
As-of date 2026-08
Sources EV-19fc47baddb21d3cc534965b
Net Winter Capacity (MW)800 MWOriginal source column definition · Generator · Canceled or Postponed
As-of date 2026-08
Sources EV-19fc47baddb21d3cc534965b
Detailed source fields
Original source fieldPublished value or condition
Entity ID55983
Entity NameLuminant Generation Company LLC
Plant ID3497
Plant NameBig Brown
Google MapMap
Bing MapMap
Plant StateTX
CountyFreestone
Balancing Authority CodeERCO
SectorIPP Non-CHP
Generator ID3
Nameplate Capacity (MW)800
Net Summer Capacity (MW)800
Net Winter Capacity (MW)800
TechnologyConventional Steam Coal
Energy Source CodeSUB
Prime Mover CodeST
Latitude31.8206
Longitude-96.0544
Original textCanceled or Postponed
Coordinate accuracysource_precision_not_independently_surveyed
source_record_idCanceled or Postponed:52

Parent facility or plant record

Coordinates locate the plant, including when this record describes one generator.

Location: Plant location · not an individual generator location

Sources, reference dates and retrieval dates 2items
eia860 ↗

Data Source 2025 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location 3_1_Generator_Y2025.xlsx#Retired and Canceled:2194

Sources EV-92756a9bc23991e2a28df9a0
Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 dcc65811e217df4137348465a6b26a16df73b756e20f37a5e4ae4b8da73e55f6

Usage terms US government public domain

eia860m ↗

Data Source 2026-08 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location Canceled or Postponed:52

Sources EV-19fc47baddb21d3cc534965b
Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 7c5911ea63d44067171f1bd50d004ba639f53ecd2bc5669e360c40e83f414802

Usage terms US government public domain

Related power and facility evidence

Loading related evidence…

Other records with the same country and operator label

These source records have not been merged as a confirmed legal entity or campus.

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel