United States of America · Generator · plant location

Laredo / 3

공식 원천의 전력 객체 · Retired

Project stage · source basis
Suspended / closed · retired
Reported operator
City of San Antonio - (TX)
Address
Check each original source
Data Reference Date
2026-08
Collection review date
2026-10-05
Location meaning
Plant location · not an individual generator location · Accuracy not disclosed
Coordinates and geometry
27.5667, -99.5089

These are source records. Operator labels do not confirm legal ownership or operations. Map locations do not verify supplying substations, power contracts or current available capacity.

Power assets and projects · USA · eia860m

Laredo / 3

Generator · Retired

Metric or conditionSource valueBasis, scope and stage
Nameplate Capacity (MW)115.2 MWOriginal source column definition · Generator · Retired
As-of date 2026-08
Sources EV-1eefc1e272678496920b66c3
Net Summer Capacity (MW)105 MWOriginal source column definition · Generator · Retired
As-of date 2026-08
Sources EV-1eefc1e272678496920b66c3
Net Winter Capacity (MW)107 MWOriginal source column definition · Generator · Retired
As-of date 2026-08
Sources EV-1eefc1e272678496920b66c3
Detailed source fields
Original source fieldPublished value or condition
Entity ID16604
Entity NameCity of San Antonio - (TX)
Plant ID3439
Plant NameLaredo
Google MapMap
Bing MapMap
Plant StateTX
CountyWebb
Balancing Authority CodeERCO
SectorElectric Utility
Generator ID3
Nameplate Capacity (MW)115.2
Net Summer Capacity (MW)105
Net Winter Capacity (MW)107
TechnologyNatural Gas Steam Turbine
Energy Source CodeNG
Prime Mover CodeST
Operating Month8
Operating Year1975
Retirement Month9
Retirement Year2008
Latitude27.5667
Longitude-99.5089
Original textRetired
Coordinate accuracysource_precision_not_independently_surveyed
source_record_idRetired:5632

Parent facility or plant record

Coordinates locate the plant, including when this record describes one generator.

Location: Plant location · not an individual generator location

Sources, reference dates and retrieval dates 2items
eia860 ↗

Data Source 2025 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location 3_1_Generator_Y2025.xlsx#Retired and Canceled:2137

Sources EV-514e376487d2e13eae6020a6
Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 3d933903c85dde739ca01ca7bcd86a5cc9debe418e00391832a70fa91c764781

Usage terms US government public domain

eia860m ↗

Data Source 2026-08 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location Retired:5632

Sources EV-1eefc1e272678496920b66c3
Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 a63fdb5b7941d8f7b13e5f9da8dd460385e7298162149cf5f5e1e1f4b87937bd

Usage terms US government public domain

Related power and facility evidence

Loading related evidence…

Other records with the same country and operator label

These source records have not been merged as a confirmed legal entity or campus.

Find related records →

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel