Parr Hydro / 2
Generator · Operations
| Metric or condition | Source value | Basis, scope and stage |
|---|---|---|
| Nameplate Capacity (MW) | 2.5 MW | Original source column definition · Generator · (OP) Operating As-of date 2026-08 Sources EV-4ebc50fe8e95064de8ce77c0 |
| Net Summer Capacity (MW) | 2.5 MW | Original source column definition · Generator · (OP) Operating As-of date 2026-08 Sources EV-4ebc50fe8e95064de8ce77c0 |
| Net Winter Capacity (MW) | 2.5 MW | Original source column definition · Generator · (OP) Operating As-of date 2026-08 Sources EV-4ebc50fe8e95064de8ce77c0 |
| Planned Uprate of Summer Capacity (MW) | 2.2 MW | Original source column definition · Generator · (OP) Operating As-of date 2026-08 Sources EV-4ebc50fe8e95064de8ce77c0 |
Detailed source fields
| Original source field | Published value or condition |
|---|---|
| Entity ID | 17539 |
| Entity Name | Dominion Energy South Carolina, Inc |
| Plant ID | 3290 |
| Plant Name | Parr Hydro |
| Google Map | Map |
| Bing Map | Map |
| Plant State | SC |
| County | Fairfield |
| Balancing Authority Code | SCEG |
| Sector | Electric Utility |
| Generator ID | 2 |
| Nameplate Capacity (MW) | 2.5 |
| Net Summer Capacity (MW) | 2.5 |
| Net Winter Capacity (MW) | 2.5 |
| Technology | Conventional Hydroelectric |
| Energy Source Code | WAT |
| Prime Mover Code | HY |
| Operating Month | 8 |
| Operating Year | 1914 |
| Status | (OP) Operating |
| Planned Uprate Year | 2028 |
| Planned Uprate Month | 12 |
| Planned Uprate of Summer Capacity (MW) | 2.2 |
| Latitude | 34.26132 |
| Longitude | -81.33085 |
| Original text | (OP) Operating |
| Coordinate accuracy | source_precision_not_independently_surveyed |
| source_record_id | Operating:4723 |
Parent facility or plant record
Coordinates locate the plant, including when this record describes one generator.
Location: Plant location · not an individual generator location
Sources, reference dates and retrieval dates 2items
Data Source 2025 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
Source location 3_1_Generator_Y2025.xlsx#Operable:4718
Sources EV-1aabad822a6fff16945dab44Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 ded9d4efd7e371c3b65ff5e9e9747dc13b09039fdcbc7b0da7272468b12a4c74
Usage terms US government public domain
Data Source 2026-08 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
Source location Operating:4723
Sources EV-4ebc50fe8e95064de8ce77c0Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 8d3bcf9f497e0455e8b20d85e739fdd23ad16ec1c5a48730beba1b97971a6618
Usage terms US government public domain
