Gaston Shoals / 3
Generator · Retired
| Metric or condition | Source value | Basis, scope and stage |
|---|---|---|
| Nameplate Capacity (MW) | 1.4 MW | Original source column definition · Generator · Retired As-of date 2026-08 Sources EV-ba5edf6b1fad97b437b45924 |
| Net Summer Capacity (MW) | 1 MW | Original source column definition · Generator · Retired As-of date 2026-08 Sources EV-ba5edf6b1fad97b437b45924 |
| Net Winter Capacity (MW) | 1 MW | Original source column definition · Generator · Retired As-of date 2026-08 Sources EV-ba5edf6b1fad97b437b45924 |
Detailed source fields
| Original source field | Published value or condition |
|---|---|
| Entity ID | 63010 |
| Entity Name | Northbrook Carolina Hydro II, LLC |
| Plant ID | 3258 |
| Plant Name | Gaston Shoals |
| Google Map | Map |
| Bing Map | Map |
| Plant State | SC |
| County | Cherokee |
| Balancing Authority Code | DUK |
| Sector | IPP Non-CHP |
| Generator ID | 3 |
| Nameplate Capacity (MW) | 1.4 |
| Net Summer Capacity (MW) | 1 |
| Net Winter Capacity (MW) | 1 |
| Technology | Conventional Hydroelectric |
| Energy Source Code | WAT |
| Prime Mover Code | HY |
| Operating Month | 8 |
| Operating Year | 1908 |
| Retirement Month | 7 |
| Retirement Year | 2025 |
| Latitude | 35.1381 |
| Longitude | -81.5975 |
| Original text | Retired |
| Coordinate accuracy | source_precision_not_independently_surveyed |
| source_record_id | Retired:130 |
Parent facility or plant record
Coordinates locate the plant, including when this record describes one generator.
Location: Plant location · not an individual generator location
Sources, reference dates and retrieval dates 2items
Data Source 2025 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
Source location 3_1_Generator_Y2025.xlsx#Retired and Canceled:2029
Sources EV-572339613740dbcebc7da98dEvidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 cf18892cf93949450bef9ac0fcd94101f14ad24d6b30e12ad95721e4f0fdcc56
Usage terms US government public domain
Data Source 2026-08 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
Source location Retired:130
Sources EV-ba5edf6b1fad97b437b45924Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 6a09d8daa30360a007c744cefca7a33012bdf053e07f0d89642a8fc3fc72a3b8
Usage terms US government public domain
