United States of America · Generator · plant location

H B Robinson / 1

공식 원천의 전력 객체 · Retired

Project stage · source basis
Suspended / closed · retired
Reported operator
Duke Energy Progress - (NC)
Address
Check each original source
Data Reference Date
2026-08
Collection review date
2026-10-05
Location meaning
Plant location · not an individual generator location · Accuracy not disclosed
Coordinates and geometry
34.4017, -80.1589

These are source records. Operator labels do not confirm legal ownership or operations. Map locations do not verify supplying substations, power contracts or current available capacity.

Power assets and projects · USA · eia860m

H B Robinson / 1

Generator · Retired

Metric or conditionSource valueBasis, scope and stage
Nameplate Capacity (MW)206.6 MWOriginal source column definition · Generator · Retired
As-of date 2026-08
Sources EV-105cabe45aab73e209014440
Net Summer Capacity (MW)177 MWOriginal source column definition · Generator · Retired
As-of date 2026-08
Sources EV-105cabe45aab73e209014440
Net Winter Capacity (MW)179 MWOriginal source column definition · Generator · Retired
As-of date 2026-08
Sources EV-105cabe45aab73e209014440
Detailed source fields
Original source fieldPublished value or condition
Entity ID3046
Entity NameDuke Energy Progress - (NC)
Plant ID3251
Plant NameH B Robinson
Google MapMap
Bing MapMap
Plant StateSC
CountyDarlington
Balancing Authority CodeCPLE
SectorElectric Utility
Generator ID1
Nameplate Capacity (MW)206.6
Net Summer Capacity (MW)177
Net Winter Capacity (MW)179
TechnologyConventional Steam Coal
Energy Source CodeBIT
Prime Mover CodeST
Operating Month5
Operating Year1960
Retirement Month10
Retirement Year2012
Latitude34.4017
Longitude-80.1589
Original textRetired
Coordinate accuracysource_precision_not_independently_surveyed
source_record_idRetired:4504

Parent facility or plant record

Coordinates locate the plant, including when this record describes one generator.

Location: Plant location · not an individual generator location

Sources, reference dates and retrieval dates 2items
eia860 ↗

Data Source 2025 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location 3_1_Generator_Y2025.xlsx#Retired and Canceled:2024

Sources EV-c1bb4e5737a13c261439d5ab
Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 ffcac1db06c8668375499744e89a4fd55a611d495ec34227afe6321143c0c7f7

Usage terms US government public domain

eia860m ↗

Data Source 2026-08 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location Retired:4504

Sources EV-105cabe45aab73e209014440
Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 978170533bfc383dbcd9672ff2f0e91e456ca4e94dd706505df2340d857ae749

Usage terms US government public domain

Related power and facility evidence

Loading related evidence…

Other records with the same country and operator label

These source records have not been merged as a confirmed legal entity or campus.

Find related records →

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel