Darlington County / 9
Generator · Retired
| Metric or condition | Source value | Basis, scope and stage |
|---|---|---|
| Nameplate Capacity (MW) | 66.8 MW | Original source column definition · Generator · Retired As-of date 2026-08 Sources EV-3f348ad711cc54778196257e |
| Net Summer Capacity (MW) | 50 MW | Original source column definition · Generator · Retired As-of date 2026-08 Sources EV-3f348ad711cc54778196257e |
| Net Winter Capacity (MW) | 65 MW | Original source column definition · Generator · Retired As-of date 2026-08 Sources EV-3f348ad711cc54778196257e |
Detailed source fields
| Original source field | Published value or condition |
|---|---|
| Entity ID | 3046 |
| Entity Name | Duke Energy Progress - (NC) |
| Plant ID | 3250 |
| Plant Name | Darlington County |
| Google Map | Map |
| Bing Map | Map |
| Plant State | SC |
| County | Darlington |
| Balancing Authority Code | CPLE |
| Sector | Electric Utility |
| Generator ID | 9 |
| Nameplate Capacity (MW) | 66.8 |
| Net Summer Capacity (MW) | 50 |
| Net Winter Capacity (MW) | 65 |
| Technology | Petroleum Liquids |
| Energy Source Code | DFO |
| Prime Mover Code | GT |
| Operating Month | 9 |
| Operating Year | 1974 |
| Retirement Month | 6 |
| Retirement Year | 2017 |
| Latitude | 34.4185 |
| Longitude | -80.1657 |
| Original text | Retired |
| Coordinate accuracy | source_precision_not_independently_surveyed |
| source_record_id | Retired:2823 |
Parent facility or plant record
Coordinates locate the plant, including when this record describes one generator.
Location: Plant location · not an individual generator location
Sources, reference dates and retrieval dates 2items
Data Source 2025 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
Source location 3_1_Generator_Y2025.xlsx#Retired and Canceled:2023
Sources EV-5ae0ac3d52597d83d208d041Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 73bca1a59cc514bc61d1514a32e4bbc0444bb56dd2b89dcb4854127e9f37c1f8
Usage terms US government public domain
Data Source 2026-08 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
Source location Retired:2823
Sources EV-3f348ad711cc54778196257eEvidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 cceefe01210b5841d69b2a8a11bf0558d0d7318552d394600255b718adf9aae2
Usage terms US government public domain
