Darlington County / 2
Generator · Retired
| Metric or condition | Source value | Basis, scope and stage |
|---|---|---|
| Nameplate Capacity (MW) | 65.8 MW | Original source column definition · Generator · Retired As-of date 2026-08 Sources EV-0cb6038411f492167d036d85 |
| Net Summer Capacity (MW) | 48 MW | Original source column definition · Generator · Retired As-of date 2026-08 Sources EV-0cb6038411f492167d036d85 |
| Net Winter Capacity (MW) | 61 MW | Original source column definition · Generator · Retired As-of date 2026-08 Sources EV-0cb6038411f492167d036d85 |
Detailed source fields
| Original source field | Published value or condition |
|---|---|
| Entity ID | 3046 |
| Entity Name | Duke Energy Progress - (NC) |
| Plant ID | 3250 |
| Plant Name | Darlington County |
| Google Map | Map |
| Bing Map | Map |
| Plant State | SC |
| County | Darlington |
| Balancing Authority Code | CPLE |
| Sector | Electric Utility |
| Generator ID | 2 |
| Nameplate Capacity (MW) | 65.8 |
| Net Summer Capacity (MW) | 48 |
| Net Winter Capacity (MW) | 61 |
| Technology | Petroleum Liquids |
| Energy Source Code | DFO |
| Prime Mover Code | GT |
| Operating Month | 8 |
| Operating Year | 1974 |
| Retirement Month | 3 |
| Retirement Year | 2020 |
| Latitude | 34.4185 |
| Longitude | -80.1657 |
| Original text | Retired |
| Coordinate accuracy | source_precision_not_independently_surveyed |
| source_record_id | Retired:1846 |
Parent facility or plant record
Coordinates locate the plant, including when this record describes one generator.
Location: Plant location · not an individual generator location
Sources, reference dates and retrieval dates 2items
Data Source 2025 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
Source location 3_1_Generator_Y2025.xlsx#Retired and Canceled:2016
Sources EV-03902adf79943dede05aa293Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 7c16a538338f87fcca1b6fd80e9ea6bd123235087c089817b2b8ef7b40a8c291
Usage terms US government public domain
Data Source 2026-08 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
Source location Retired:1846
Sources EV-0cb6038411f492167d036d85Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 150c702eadd8cd54b55491c924424f680e0bd752528790012eeefef383b9b663
Usage terms US government public domain