Bonneville / 9
Generator · Out of service
| Metric or condition | Source value | Basis, scope and stage |
|---|---|---|
| Nameplate Capacity (MW) | 62.1 MW | Original source column definition · Generator · (OA) Out of service but expected to return to service in next calendar year As-of date 2026-08 Sources EV-024fcb9ced083f00c70eb3fb |
| Net Summer Capacity (MW) | 62.1 MW | Original source column definition · Generator · (OA) Out of service but expected to return to service in next calendar year As-of date 2026-08 Sources EV-024fcb9ced083f00c70eb3fb |
| Net Winter Capacity (MW) | 62.1 MW | Original source column definition · Generator · (OA) Out of service but expected to return to service in next calendar year As-of date 2026-08 Sources EV-024fcb9ced083f00c70eb3fb |
Detailed source fields
| Original source field | Published value or condition |
|---|---|
| Entity ID | 19400 |
| Entity Name | USACE Northwestern Division |
| Plant ID | 3075 |
| Plant Name | Bonneville |
| Google Map | Map |
| Bing Map | Map |
| Plant State | OR |
| County | Multnomah |
| Balancing Authority Code | BPAT |
| Sector | Electric Utility |
| Generator ID | 9 |
| Nameplate Capacity (MW) | 62.1 |
| Net Summer Capacity (MW) | 62.1 |
| Net Winter Capacity (MW) | 62.1 |
| Technology | Conventional Hydroelectric |
| Energy Source Code | WAT |
| Prime Mover Code | HY |
| Operating Month | 10 |
| Operating Year | 1943 |
| Status | (OA) Out of service but expected to return to service in next calendar year |
| Latitude | 45.6441 |
| Longitude | -121.941 |
| Original text | (OA) Out of service but expected to return to service in next calendar year |
| Coordinate accuracy | source_precision_not_independently_surveyed |
| source_record_id | Operating:4463 |
Parent facility or plant record
Coordinates locate the plant, including when this record describes one generator.
Location: Plant location · not an individual generator location
Sources, reference dates and retrieval dates 2items
Data Source 2025 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
Source location 3_1_Generator_Y2025.xlsx#Operable:4458
Sources EV-9558fbb0ed8c686cef4df7b5Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 5bd3c690dc5e2c6f9d3abe8564819c93e2a2b5391c8a2baabc2f16d9e48751d0
Usage terms US government public domain
Data Source 2026-08 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
Source location Operating:4463
Sources EV-024fcb9ced083f00c70eb3fbEvidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 db6cddf6a723d4fcf16eadd003a9dc2399c3302e8c3be31b2eeed6dbdb466eba
Usage terms US government public domain
