Big Cliff / 1
Generator · Out of service
| Metric or condition | Source value | Basis, scope and stage |
|---|---|---|
| Nameplate Capacity (MW) | 18 MW | Original source column definition · Generator · (OA) Out of service but expected to return to service in next calendar year As-of date 2026-08 Sources EV-c3a95383249d6344325fe87f |
| Net Summer Capacity (MW) | 21 MW | Original source column definition · Generator · (OA) Out of service but expected to return to service in next calendar year As-of date 2026-08 Sources EV-c3a95383249d6344325fe87f |
| Net Winter Capacity (MW) | 21 MW | Original source column definition · Generator · (OA) Out of service but expected to return to service in next calendar year As-of date 2026-08 Sources EV-c3a95383249d6344325fe87f |
Detailed source fields
| Original source field | Published value or condition |
|---|---|
| Entity ID | 19400 |
| Entity Name | USACE Northwestern Division |
| Plant ID | 3074 |
| Plant Name | Big Cliff |
| Google Map | Map |
| Bing Map | Map |
| Plant State | OR |
| County | Marion |
| Balancing Authority Code | BPAT |
| Sector | Electric Utility |
| Generator ID | 1 |
| Nameplate Capacity (MW) | 18 |
| Net Summer Capacity (MW) | 21 |
| Net Winter Capacity (MW) | 21 |
| Technology | Conventional Hydroelectric |
| Energy Source Code | WAT |
| Prime Mover Code | HY |
| Operating Month | 12 |
| Operating Year | 1954 |
| Status | (OA) Out of service but expected to return to service in next calendar year |
| Latitude | 44.7514 |
| Longitude | -122.2832 |
| Original text | (OA) Out of service but expected to return to service in next calendar year |
| Coordinate accuracy | source_precision_not_independently_surveyed |
| source_record_id | Operating:4445 |
Parent facility or plant record
Coordinates locate the plant, including when this record describes one generator.
Location: Plant location · not an individual generator location
Sources, reference dates and retrieval dates 2items
Data Source 2025 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
Source location 3_1_Generator_Y2025.xlsx#Operable:4440
Sources EV-a0f3016c2ce932b3bae929f3Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 f7efc0f8942a4509c3c2e13ded4d8acdd4bb9c0bb16bc3aa283fd08001a955dd
Usage terms US government public domain
Data Source 2026-08 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
Source location Operating:4445
Sources EV-c3a95383249d6344325fe87fEvidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 a121e8053bc332b5527578e7c804116438aabcb8ba08f8604404914508a1e5b9
Usage terms US government public domain
