Blundell / 3
Generator · Cancelled or postponed
| Metric or condition | Source value | Basis, scope and stage |
|---|---|---|
| Nameplate Capacity (MW) | 30 MW | Original source column definition · Generator · Canceled or Postponed As-of date 2026-08 Sources EV-139d314d825b908646024b48 |
| Net Summer Capacity (MW) | 35 MW | Original source column definition · Generator · Canceled or Postponed As-of date 2026-08 Sources EV-139d314d825b908646024b48 |
| Net Winter Capacity (MW) | 35 MW | Original source column definition · Generator · Canceled or Postponed As-of date 2026-08 Sources EV-139d314d825b908646024b48 |
Detailed source fields
| Original source field | Published value or condition |
|---|---|
| Entity ID | 14354 |
| Entity Name | PacifiCorp |
| Plant ID | 299 |
| Plant Name | Blundell |
| Google Map | Map |
| Bing Map | Map |
| Plant State | UT |
| County | Beaver |
| Balancing Authority Code | PACE |
| Sector | Electric Utility |
| Generator ID | 3 |
| Nameplate Capacity (MW) | 30 |
| Net Summer Capacity (MW) | 35 |
| Net Winter Capacity (MW) | 35 |
| Technology | Geothermal |
| Energy Source Code | GEO |
| Prime Mover Code | ST |
| Latitude | 38.4889 |
| Longitude | -112.8533 |
| Original text | Canceled or Postponed |
| Coordinate accuracy | source_precision_not_independently_surveyed |
| source_record_id | Canceled or Postponed:12 |
Parent facility or plant record
Coordinates locate the plant, including when this record describes one generator.
Location: Plant location · not an individual generator location
Sources, reference dates and retrieval dates 2items
Data Source 2025 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
Source location 3_1_Generator_Y2025.xlsx#Retired and Canceled:156
Sources EV-1d81a143235505fb00db8bc9Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 54bfb389525f6c91f4a45689cb15adba3e66277b79a38f9ded5a3b1610bcf6b3
Usage terms US government public domain
Data Source 2026-08 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
Source location Canceled or Postponed:12
Sources EV-139d314d825b908646024b48Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 625591809abac3f363edf109a25fb64049715c22d01dbc44d1af71ef5526e7c7
Usage terms US government public domain
