San Joaquin 3 / 3
Generator · Out of service
| Metric or condition | Source value | Basis, scope and stage |
|---|---|---|
| Nameplate Capacity (MW) | 4 MW | Original source column definition · Generator · (OS) Out of service and NOT expected to return to service in next calendar year As-of date 2026-08 Sources EV-760d2de25022745fa3a34224 |
| Net Summer Capacity (MW) | 4.2 MW | Original source column definition · Generator · (OS) Out of service and NOT expected to return to service in next calendar year As-of date 2026-08 Sources EV-760d2de25022745fa3a34224 |
| Net Winter Capacity (MW) | 4.2 MW | Original source column definition · Generator · (OS) Out of service and NOT expected to return to service in next calendar year As-of date 2026-08 Sources EV-760d2de25022745fa3a34224 |
Detailed source fields
| Original source field | Published value or condition |
|---|---|
| Entity ID | 14328 |
| Entity Name | Pacific Gas & Electric Co. |
| Plant ID | 277 |
| Plant Name | San Joaquin 3 |
| Google Map | Map |
| Bing Map | Map |
| Plant State | CA |
| County | Madera |
| Balancing Authority Code | CISO |
| Sector | Electric Utility |
| Generator ID | 3 |
| Nameplate Capacity (MW) | 4 |
| Net Summer Capacity (MW) | 4.2 |
| Net Winter Capacity (MW) | 4.2 |
| Technology | Conventional Hydroelectric |
| Energy Source Code | WAT |
| Prime Mover Code | HY |
| Operating Month | 8 |
| Operating Year | 1923 |
| Status | (OS) Out of service and NOT expected to return to service in next calendar year |
| Latitude | 37.253718 |
| Longitude | -119.5194 |
| Original text | (OS) Out of service and NOT expected to return to service in next calendar year |
| Coordinate accuracy | source_precision_not_independently_surveyed |
| source_record_id | Operating:500 |
Parent facility or plant record
Coordinates locate the plant, including when this record describes one generator.
Location: Plant location · not an individual generator location
Sources, reference dates and retrieval dates 2items
Data Source 2025 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
Source location 3_1_Generator_Y2025.xlsx#Operable:498
Sources EV-4ca253fbd6c5e948ce99726dEvidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 94fc2feee2c2927e5de98eee3d6bbd5d1f057a0377e65e6edd737786355820ac
Usage terms US government public domain
Data Source 2026-08 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
Source location Operating:500
Sources EV-760d2de25022745fa3a34224Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 518db4cbc4d41531b72d3fe7a6ae3db2915204175dc9618ffa3931b3d1a9a4f0
Usage terms US government public domain
