Walters / 2
Generator · Operations
| Metric or condition | Source value | Basis, scope and stage |
|---|---|---|
| Nameplate Capacity (MW) | 36 MW | Original source column definition · Generator · (OP) Operating As-of date 2026-08 Sources EV-d3657afffe4188a2183d6d08 |
| Net Summer Capacity (MW) | 40 MW | Original source column definition · Generator · (OP) Operating As-of date 2026-08 Sources EV-d3657afffe4188a2183d6d08 |
| Net Winter Capacity (MW) | 40 MW | Original source column definition · Generator · (OP) Operating As-of date 2026-08 Sources EV-d3657afffe4188a2183d6d08 |
Detailed source fields
| Original source field | Published value or condition |
|---|---|
| Entity ID | 3046 |
| Entity Name | Duke Energy Progress - (NC) |
| Plant ID | 2715 |
| Plant Name | Walters |
| Google Map | Map |
| Bing Map | Map |
| Plant State | NC |
| County | Haywood |
| Balancing Authority Code | CPLE |
| Sector | Electric Utility |
| Generator ID | 2 |
| Nameplate Capacity (MW) | 36 |
| Net Summer Capacity (MW) | 40 |
| Net Winter Capacity (MW) | 40 |
| Technology | Conventional Hydroelectric |
| Energy Source Code | WAT |
| Prime Mover Code | HY |
| Operating Month | 7 |
| Operating Year | 1930 |
| Status | (OP) Operating |
| Latitude | 35.6946 |
| Longitude | -83.0503 |
| Original text | (OP) Operating |
| Coordinate accuracy | source_precision_not_independently_surveyed |
| source_record_id | Operating:4091 |
Parent facility or plant record
Coordinates locate the plant, including when this record describes one generator.
Location: Plant location · not an individual generator location
Sources, reference dates and retrieval dates 2items
Data Source 2025 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
Source location 3_1_Generator_Y2025.xlsx#Operable:4086
Sources EV-5fda494d3b61c734c10dc838Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 59fa976e8a53f41f95fb70af701144c30cc208b5c657cf866111a116ba810271
Usage terms US government public domain
Data Source 2026-08 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
Source location Operating:4091
Sources EV-d3657afffe4188a2183d6d08Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 e45e99ca83880d088f37048fd1f3d37c31c3a39f1678785ef0cb73f86c5a043f
Usage terms US government public domain
