United States of America · Generator · plant location

L V Sutton Steam / GTB

공식 원천의 전력 객체 · Retired

Project stage · source basis
Suspended / closed · retired
Reported operator
Duke Energy Progress - (NC)
Address
Check each original source
Data Reference Date
2026-08
Collection review date
2026-10-05
Location meaning
Plant location · not an individual generator location · Accuracy not disclosed
Coordinates and geometry
34.283056, -77.98528

These are source records. Operator labels do not confirm legal ownership or operations. Map locations do not verify supplying substations, power contracts or current available capacity.

Power assets and projects · USA · eia860m

L V Sutton Steam / GTB

Generator · Retired

Metric or conditionSource valueBasis, scope and stage
Nameplate Capacity (MW)37.5 MWOriginal source column definition · Generator · Retired
As-of date 2026-08
Sources EV-2d48d2187b227595644c7dc9
Net Summer Capacity (MW)25 MWOriginal source column definition · Generator · Retired
As-of date 2026-08
Sources EV-2d48d2187b227595644c7dc9
Net Winter Capacity (MW)33 MWOriginal source column definition · Generator · Retired
As-of date 2026-08
Sources EV-2d48d2187b227595644c7dc9
Detailed source fields
Original source fieldPublished value or condition
Entity ID3046
Entity NameDuke Energy Progress - (NC)
Plant ID2713
Plant NameL V Sutton Steam
Google MapMap
Bing MapMap
Plant StateNC
CountyNew Hanover
Balancing Authority CodeCPLE
SectorElectric Utility
Generator IDGTB
Nameplate Capacity (MW)37.5
Net Summer Capacity (MW)25
Net Winter Capacity (MW)33
TechnologyPetroleum Liquids
Energy Source CodeDFO
Prime Mover CodeGT
Operating Month5
Operating Year1969
Retirement Month7
Retirement Year2017
Latitude34.283056
Longitude-77.98528
Original textRetired
Coordinate accuracysource_precision_not_independently_surveyed
source_record_idRetired:2800

Parent facility or plant record

Coordinates locate the plant, including when this record describes one generator.

Location: Plant location · not an individual generator location

Sources, reference dates and retrieval dates 2items
eia860 ↗

Data Source 2025 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location 3_1_Generator_Y2025.xlsx#Retired and Canceled:1800

Sources EV-fefdb8045304d1e92af6df46
Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 52876324ce78bc103dbe8b4388774b88f9daefaf22c3df8297b6683e90c839fa

Usage terms US government public domain

eia860m ↗

Data Source 2026-08 · Retrieved 2026-10-05

Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.

Source location Retired:2800

Sources EV-2d48d2187b227595644c7dc9
Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 5cea17b43a52ba4120d802fa4f55896f9cb5649c918603b92eb94f6a1ff2846e

Usage terms US government public domain

Related power and facility evidence

Loading related evidence…

Other records with the same country and operator label

These source records have not been merged as a confirmed legal entity or campus.

Find related records →

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel