Asheville / CT7
Generator · Operations
| Metric or condition | Source value | Basis, scope and stage |
|---|---|---|
| Nameplate Capacity (MW) | 191.2 MW | Original source column definition · Generator · (OP) Operating As-of date 2026-08 Sources EV-689702174978f43c12e2bc92 |
| Net Summer Capacity (MW) | 161 MW | Original source column definition · Generator · (OP) Operating As-of date 2026-08 Sources EV-689702174978f43c12e2bc92 |
| Net Winter Capacity (MW) | 203 MW | Original source column definition · Generator · (OP) Operating As-of date 2026-08 Sources EV-689702174978f43c12e2bc92 |
| Planned Uprate of Summer Capacity (MW) | 9 MW | Original source column definition · Generator · (OP) Operating As-of date 2026-08 Sources EV-689702174978f43c12e2bc92 |
Detailed source fields
| Original source field | Published value or condition |
|---|---|
| Entity ID | 3046 |
| Entity Name | Duke Energy Progress - (NC) |
| Plant ID | 2706 |
| Plant Name | Asheville |
| Google Map | Map |
| Bing Map | Map |
| Plant State | NC |
| County | Buncombe |
| Balancing Authority Code | CPLE |
| Sector | Electric Utility |
| Generator ID | CT7 |
| Unit Code | CC2 |
| Nameplate Capacity (MW) | 191.2 |
| Net Summer Capacity (MW) | 161 |
| Net Winter Capacity (MW) | 203 |
| Technology | Natural Gas Fired Combined Cycle |
| Energy Source Code | NG |
| Prime Mover Code | CT |
| Operating Month | 1 |
| Operating Year | 2020 |
| Status | (OP) Operating |
| Planned Uprate Year | 2028 |
| Planned Uprate Month | 6 |
| Planned Uprate of Summer Capacity (MW) | 9 |
| Latitude | 35.4731 |
| Longitude | -82.5417 |
| Original text | (OP) Operating |
| Coordinate accuracy | source_precision_not_independently_surveyed |
| source_record_id | Operating:4065 |
Parent facility or plant record
Coordinates locate the plant, including when this record describes one generator.
Location: Plant location · not an individual generator location
Sources, reference dates and retrieval dates 2items
Data Source 2025 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
Source location 3_1_Generator_Y2025.xlsx#Operable:4060
Sources EV-1cd248b7e6ad0db461d91955Evidence SHA-256 2b27929d26cc1da9ad6a530da1cac6718cd8496098ee560c4d47cfffd96d08ba
행 SHA-256 7272746162bc774fb461656cf5cc4af44aa3f9d15ad5c2ab38ca01d50725fde1
Usage terms US government public domain
Data Source 2026-08 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.
Source location Operating:4065
Sources EV-689702174978f43c12e2bc92Evidence SHA-256 b4b70abb4c217e8e2658c3bde7608a3d530e86a81279ccc572ced82a200e9f1c
행 SHA-256 eb2298d5c40a8cb28cf955e401eaaf98a23579beaf7aa49af26463ac50ee3cb7
Usage terms US government public domain
